Laserfiche WebLink
<br />Pj <br />.:-J <br />.. <br /> <br /> <br />1 <br />I <br /> <br />I <br />".l <br /> <br />"'( <br /> <br />. , <br /> <br />, <br />._1 <br /> <br />Sl <br /> <br />: ; <br /> <br />.., <br /> <br />; . <br /> <br /> <br /> <br />DAMES a MOORE <br /> <br />Water Resources Projects <br />Planning, Design, Construction <br /> <br />ARCO ....... <br /> <br />. Cob Lease, Colorado <br /> <br />RECONNAISSANCE STUDY AND PRELIMINARY <br />SIZING OF SEVERAL SMALL WATER <br />SUPPL Y RESERVOI RS <br /> <br />C-b Lease Oil Shale Facility <br /> <br />cmES SERVICE CO. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Copperhill, Tennessee <br /> <br />TOTAL WATER RESOURCES INVESTIGATIONS <br />FOR A 100-FOOT-HIGH FLOOD DETENTION DAM <br />AND DIVERSION TUNNEL, RANGING FROM FEASIBILITY THROUGH <br />FINAL DESIGN INCLUDING PREPARATION OF CONTRACT DOCUMENTS <br />COUPLED WITH ENGINEERING SERVICES DURING CONSTRUCTION <br /> <br />Diversion Facilities Including <br />Tunnel, Dam, Gated Outlet, Conduit and <br />Spillway <br /> <br />CLEVELAND REGIONAL SEWER DISTRICT . . . . . . . . . . . . . . . . . . Qeveland, Ohio <br /> <br />PERFORMED FOUNDATION INVESTIGATION <br />AND GEOTECHNICAL STUDIES OF FOUNDATION FOR CONCRETE <br />GRAVITY FLOOD RETENTION DAM. REVIEWED DAM DESIGN AND <br />CONTRACT DOCUMENTS PREPARED BY OTHERS. PROVIDED CONSULTING <br />SERVICES DURING CONSTRUCTION INCLUDING <br />FULL TIME FOUNDATION INSPECTION <br /> <br />Lake View Cemetery Dam Project <br /> <br />COLORADO WATER CONSERVATION BOARD ............... Denver, Colorado <br />REVIEWOF METEOROLOGY. SPILLWAY DESIGN, FLOOD <br />AND SPILLWAY OPERATION FOR MAJOR DAM AND RESERVOIR <br />Narrows Project <br /> <br />PDF 4 <br /> <br />3.77 <br />