Laserfiche WebLink
<br />'lG4J <br /> <br />'\ ~'jr'~~ <br />) F-Cr <br /> <br />. <br /> <br />Storage in Trinidad Lake. Las Animas County. Colorado u.s. Army Corps of Engineers, dated <br />September 1994, the initial filling shall only be made using waters imported into the Arkansas <br />River basin from other river basins, either by direct importation or by exchange pursuant to the ~ <br />laws of Colorado. The initial filling and the replacement of evaporation and seepage shall be <br />made according to the following procedures: <br /> <br />(a) All water rights on the Pur~atoire River downstream of Trinidad Reservoir V' <br />will be satisfied during the period of any exchange; <br /> <br />(b) Prior to any exchange, the specific source of imported or native water, as / <br />limited by the Operating Principles for Trinidad Dam and Reservoir Project, as amended, will be <br />verified by the Colorado State Engineer; <br /> <br />(c) For each acre-foot of native water stored in Trinidad Reservoir by <br />exchange, the Colorado Division of Parks will deliver an acre-foot ofIdentifiable Imported <br />water, or native water whose consumptive use has been determined by final decree of the <br />Colorado Water Court, to the Arkansas River at Las Animas gauging station; <br /> <br />(.:' <br /> <br />v <br /> <br />(d) Transit losses between the source of supply for an exchange and the Las ~ <br />Animas gauge will be determined and assessed by the Colorado State Engineer, using the <br />"Livingston Method" or other suitable means, to assure that a "one for one" exchange is <br />accomplished. <br /> <br />. <br /> <br />The Colorado State Engineer will report and account contemporaneously and annually to / <br />the Arkansas River Compact Administration on the initial filling and replacement of evaporation <br />and seepage in the permanent fishery pool. <br /> <br />2. In the accounting for water in storage, evaporation and seepage losses due to the /' <br />permanent fishery pool shall be determined using the most recent data available by the Colorado <br />State Engineer and the District with the cooperation of the operating agency. <br /> <br />3. There shall never be any release or transfer of water from the permanent fishery \./' <br />!illQ/ excepting by necessity of dam safety or flood emerl?ency operations as determined by the <br />Cows of Engineers. District Engineer. <br /> <br />Article VI - REVIEW AND AMENDMENT <br /> <br />These operating principles may be subject to review and amendment not more than once <br />a year at the request of any of the parties' signatory; provided, that at least one review shall be <br />accomplished within the first 10 years following completion of the Trinidad Dam and at least <br />one review shall be accomplished every 10 years thereafter. The primary obiect of such reviews <br />will be obtaining optimum beneficial use of water as conditions change, operating experience is <br />gained, and more technical data become available. <br /> <br />/' <br /> <br />. <br /> <br />11 <br />