My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07302
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:42 PM
Creation date
10/12/2006 2:14:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agencies - USDA
Basin
Colorado Mainstem
Water Division
5
Date
9/20/1991
Title
Colorado River Salinity Control Program - Lower Gunnison No 1 -Tongue Creek
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />~ <br />tv <br />~ <br />w:... <br /> <br />D. Prior-jty Areas and Pr-joritj=ation <br /> <br />;i ~~~#j <br />-('.i~.. <br /> <br />and <br /> <br />1. The estab Ii shelj pt- i r)t" i ty <br />no additional changes are for"eseen at <br /> <br />systern seems <br />this time. <br /> <br />to be working wel I <br /> <br />2. Criteria for t-ating priority areas within the Lower <br />Gunnison #1 Tongue Creek Project Ar"ea wi I I be.: <br /> <br />1. Criteria fl)r t"atirl9 prlc1rity areas within the Lower <br />Gu~nison #1 (Tongue C:t"eek) Pr"oject Area is based on the <br />salt I.:tad rneasurJ?d fr-orn cer-tain II)CatlorlS '..Jjthin these <br />watersheds. Each watershed ~s 3\ven a point rating fac- <br />tor- t1a.sed r)n the 'Salt loading measurements l,.Jith the <br />tlighest recelvir'9 the most points. See attathement 3 <br />F:::at i ng Fact(lt"S. <br /> <br />3. Rating factors. <br /> <br />See attathment #31 <br /> <br />a. r"( p e ':' f pl.- 0 .:J e C t, :-3 r- I) U P (1 ~.. j n d j \I j d u a. I . <br /> <br />b. Pr~ority at"ea (If ~ork. <br /> <br />c. Scope of wor'~. tn be done. <br /> <br />d. Schedule (It" a.ppl ~cation fr:lr- 1..JI,)t-k to be c(lrnpleted. <br /> <br />~;;~~;J <br /> <br />e. Extent (If' rreeded Sa I; n i ty Contr-o I '.-Jot-k, Cr:-mp I eted <br />under the other- programs. <br /> <br />f. Coodination with another pr"oject. <br /> <br />g. Signup period. <br /> <br />E; Monitoring and Evaluation (MBEI <br /> <br />Objectives of the MonItoring and Evaluatiorl are: <br /> <br />1. To quantify through a data gathering and evaluation <br />attivity the salt load reduttion attributable to improved irrigation water <br />management. <br /> <br />2. To provide farmet"s with improved technical assistance for <br />achieving irrigation water management. <br /> <br />3. To evaluate changes in wetland and wi I,jl ife habitat <br />resulting from improved irrigation sy~tems and irrigation water management. <br />HEP system models are being developed to evaluate before and after values <br />of habitat for subjett species. <br /> <br />4. To determine local economic impacts of this salinity <br /> <br />"roject. <br /> <br />.-=:... <br /> <br />5. To determine thanges that should be made <br />to athieve sal inity tontrol e.t,jectives. <br /> <br />in the project <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.