My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07302
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:42 PM
Creation date
10/12/2006 2:14:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agencies - USDA
Basin
Colorado Mainstem
Water Division
5
Date
9/20/1991
Title
Colorado River Salinity Control Program - Lower Gunnison No 1 -Tongue Creek
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />RATING FACTORS <br /> <br />~z~::) <br /> <br />TYPE OF PROJECT: <br /> <br />Gt.oup pt-ojects \HI I ! have ~.t"i(q.ity .:.vet"" ir.dividual pr-ojects <br />as ll)rl~3 as they at-!? ',,)1 th in the scope of the pro:3rarn. <br /> <br />t.] <br />N <br />(J'I <br />"'-l <br /> <br />F'RIORITY AREA: <br /> <br />WSOOl - --------- 15 P ':' I nts <br />WS004 - --------- 1 - P I nts <br />WSOO:::: - --------- 0'.7) P r) i nts <br />WSOO2 ---------- 06 ~, (, i nts <br />WSO 2 I':' ---------- 0.:;: p.:. I nts <br /> <br />SCOPE elF "WRf<: <br /> <br />S a I t t" e d U f;: t i CI fl and '..,1 J I ,j I j f e - - - .... - - .... - - 1 5 P I) i n t 5 <br />Salt t"eduction onlv ----------------- 10 points <br />.Wi ldl ife ':.nly ----------------------- ():3 points <br /> <br />SCHEDULE OF APPLICATION: <br /> <br />:\~.~.~ <br />'_'_:~:'_ :r <br /> <br />Less than 5 years ------------------- 05 points <br />More than 5 years ------------------- 03 points <br /> <br />EXTENT OF SALINITY CONTROL WORK DONE: <br /> <br />More than 50% ----------------------- 05 points <br />Less than 50% ----------------------- 03 points <br /> <br />COORDINATION WITH ANOTHER PROJECT: <br /> <br />Yes --------------------------------- 05 points <br />No -------~-------------------------- 01 point <br /> <br />SIGNUP PERWD: <br /> <br />:... <br /> <br />All applications will bE> serviced according to ranking <br />after applying the above rating system to each. High <br />priority jobs wi I I be planned before proceeding to lower <br />prio'"ity jobs. Applicants unable to ma.ke fi,om planning <br />decisions wi I' be servited when decisions tan be made. <br />Appi ications from a previous sign-up wi II be given an <br />additional five (5) points when a new sign-up is added to <br />to the priority listing, the additional (5) points will be <br />given one time only. A secondary priority system based on <br />cost per ton of sal t reducti on ($60/ton) wi II be used when <br />there are more salt plans than Funds available for <br />contracting_ <br /> <br />ATTACHMENT #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.