My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07295
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:41 PM
Creation date
10/12/2006 2:14:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.45.J
Description
Redlands Fish Ladder
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1998
Author
USDOI/BOR
Title
Final Environmental Assessment - Passageway Around the Redlands Diversion Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />effect of this program and others of the Recovery Program, are designed to recover <br />endangered fish species while allowing water development and use to continue. <br /> <br />Following the public meetings, there was more input on protection of historical water uses. <br />There have been several meetings to discuss possible ways to legally provide for boaters to take <br />out of the Gunnison Riyer upstream from the Redlands Diversion Dam or to portage around it. <br />The issues that have been raised are addressed in the planning of the fish passageway and <br />interim contract negotiations and in the final EA. <br /> <br />Review of Draft Environmental Assessment <br /> <br />In February 1995, a draft EA was distributed to agencies, organizations, and interested parties <br />as listed in Appendix D. In March, two public meetings were held, one in Gunnison and one <br />in Grand Junction, to answer questions and to discuss the draft EA. Approximately 25 comment <br />letters were received. In addition verbal comments were received at the public meetings. <br /> <br />In general, the comments supported the program to help recover the endangered fish but <br />expressed concerns that existing and future water resource use and recreation be protected. <br />Several comments disagreed with the program entirely and suggested it not be implemented. <br />Major areas of concern included: <br /> <br />. The EA and interim water agreement should more clearly protect existing water uses along <br />the Gunnison River. <br /> <br />. Effects on hydropower and other economic effects should be presented in more detail. <br /> <br />. Effectiveness of the fish passageway and its actual effect on the recovery of the endangered <br />fish should be better explained. <br /> <br />. Effect on the purposes of the Aspinall Unit and effect on other planned water projects needs <br />to be clarified. <br /> <br />Or~aJli7:ltional Comments <br /> <br />The Upper Gunnison River Water Conservancy District wrote in support of the interim water <br />agreement as revised during final negotiations and as presented in this final EA. The Colorado <br />River Water Conservation District wrote of general support of the draft EA provided that it and <br />the interim agreement reflect Reclamation's commitment to operate the Aspinall Unit to avoid <br />significant negative impacts to water users. The Colorado Water Conservation Board supported <br />the interim water agreement hased on negotiated language that protected a variety of water uses. <br />They also requested that the fmal EA provide more information on impacts to Blue Mesa <br />Reservoir, on economic factors, on water compacts, on the "148,000 acre-feet set aside" for <br /> <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.