My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07295
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:41 PM
Creation date
10/12/2006 2:14:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.45.J
Description
Redlands Fish Ladder
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1998
Author
USDOI/BOR
Title
Final Environmental Assessment - Passageway Around the Redlands Diversion Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />water development--suppons this goal. The Colorado Water Conservation Board is currently <br />conducting studies 10 detennine how to implement the Recovery Program withaur affecting <br />Colorado's portion of the Colorado River Compact waters. Colorado is finn that the <br />Recovery Program shauld not adversely affect the Compact. <br /> <br />ASPINAll- UNIT--Why does this unit have to provide water for endangered fIsh; what is the <br />relation between the Dolores and Dallas Creek Projects and the Aspinall Unit; will the <br />program affect water available for other uses in Blue Mesa Reservoir; and what are the <br />economic effects of using Aspinall water? <br /> <br />lWlen the Dallas Creek and Dolores Projecrs were consrructed to help develop Colorado's <br />water, it was agreed to use Aspinall Unit storage to ojJsetthe impacts of these projects. This <br />agreement set aside some of the water in the reservoir for endangered fish. Water is <br />available in Blue Mesa for a variety of purposes, including fish and wildlife and economic <br />development. In the total picture, all the water for endangered fish will not come from the <br />Aspinall Unit. Recovery effons are basinwide. For example, releases are now being made <br />for endangeredfishfrom Ruedi Reservoir, which is pan of a transmounrain diversion project. <br /> <br />RECOVERY PROGRAM--Who represents different interests on this program? There is not <br />local support. <br /> <br />The Recovery Program includes strong representation of State and private organizations <br />including water user and development interests, in addition to groups whose primary interest <br />is conserving endangered species. There is suppon for the program as being the best <br />solution for protecting endangered species and water development interests. It is recognized <br />that the program is controversial. Local public input has stressed that the program should <br />not adversely affect benefits associated with existing water projects and reservoir operations. <br /> <br />RIVER FLOWS--How much water is needed for the endangered fish; what are priorities during <br />droughts; how does the endangered fish water relate to water for the Black Canyon of the <br />Gunnison National Monument's reserved water right; and how will water releases affect <br />recreation? <br /> <br />Under the interim water agreement, aflow of 300 eft will be maintained downstream from <br />the Redlands Diversion Dam in July through October. This flow, and its effects, will be <br />monitored. In droughts, the interim agreement provides for decreased flows for endangered <br />fish to help preserve water storage. Following completion of endangered fish studies, long- <br />tenn flow recommendations will be evaluared. Endangered fish water comes from water <br />stored in Blue Mesa Reservoir and does not directly relate to the Monument's reserved water <br />right. Under the interim agreement, endangered fish water would most likely flow through <br />the Monument and help meet its needs provided those flows are concomitant with the <br />resource protection needs of the Monument. River recreation shauld be slightly benefilled <br />as flows are improved in July and August of dry years. Reservoir recreation at Blue Mesa <br /> <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.