My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07295
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:41 PM
Creation date
10/12/2006 2:14:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.45.J
Description
Redlands Fish Ladder
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1998
Author
USDOI/BOR
Title
Final Environmental Assessment - Passageway Around the Redlands Diversion Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />of 750 cfs. The State Engineer would then curtail diversions of upstream junior rights on the <br />Gunnison River or its tributaries. <br /> <br />Calls affect water users along the river and its tributaries from Gunnison and Hinsdale Counties <br />to Mesa County, On streams upstream from Blue Mesa Reservoir, junior water users were <br />historically shut down by calls of the Redlands Diversion Dam or Gunnison Tunnel. Calls on <br />the river have decreased since the Aspinall Unit began operations in the 1960's. This is because <br />the Unit stores water in high flow periods and releases the water to increase river flows in <br />nonnally low water periods as was shown in Figure 2. Senior water right holders, such as for <br />the Red1ands Diversion Dam, have had more dependable water supplies and junior water rights <br />have been protected from being "called out." <br /> <br />In the future, whether or not the alternatives outlined in this assessment are implemented, it is <br />expected that there will be more administration of water rights and uses in the Gunnison Basin <br />due to a variety of factors: <br /> <br />. Completion of a Biological Opinion on Aspinall Unit Operations - This will be prepared in <br />2-3 years and will recommend operation changes to help protect and recover endangered fish <br />species downstream in the Gunnison and Colorado Rivers. The Opinion will likely call for <br />higher spring releases and lower winter releases to more closely simulate natural seasonal <br />flow patterns. This would be more like historic conditions, when calls were more frequent. <br /> <br />. Quantification of the reserved water right established for the Black Canyon of the Gunnison <br />National Monument - This right dates back to establishment of the Monument in 1933, but <br />its quantity in flow (cfs) has not been detennined. The date of this water right makes it <br />senior to Blue Mesa storage rights. When quantified, a defmed flow pattern or a set quantity <br />of water may be required to be released from the Aspinall Unit to the river as it flows <br />through the Monument. Calls on this right may affect water available to upstream junior <br />water rights in the Upper Gunnison Basin and water storage in Blue Mesa Reservoir. <br /> <br />. Future sales of Aspinall Unit water and potential development of proposed water projects <br />upstream from the Redlands Diversion Dam - Currently proposed projects include the <br />Dominguez Reservoir Project between Delta and Grand Junction, and transmountain. <br />diversion projects that would divert Gunnison flows to the eastern slope of Colorado. <br /> <br />In summary, existing conditions provide for storage and release of water by the Aspinall Unit <br />in a manner that has increased the supply of water to water users throughout the basin. <br />Commitments of water to benefit endangered fish have also been made. <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.