<br />3367 <br /> <br />POTENTIAL COMBINED STORAGE <br />OPTIONS (TASK 12) <br /> <br />. PLAN A - REOPERATION AND EXPANDED <br />STORAGE AT PROJECT FACILITIES <br />. PLAN B - ADDITIONAL PROJECT STORAGE <br />PLUS UPPER BASIN STORAGE <br />. PLAN C - REOPERATION PLUS STORAGE AT <br />NON-PROJECT FACILITIES <br />. PLAN D - REOPERATION PLUS NEW STORAGE <br />AT PROJECT FACILITIES IN UPPER AND <br />LOWER BASIN <br />. COST RANGE $34 TO $174 MILLION <br /> <br /><I> GEl Con5ultant~. Inc. <br /> <br />NON-STRUCTURAL OPTIONS <br /> <br />. EXCHANGES <br />, DROUGHT LEASING <br />, DROUGHT INSURANCE <br />, LEGAL IMPLICATIONS <br />, USE THESE MEASURES WITH NEW <br />STRUCTURAL MEASURES TO BETTER MANAGE <br />WATER RESOURCES <br /> <br /><I> G [I COR5ullant~. Inc. <br /> <br />9 <br />