Laserfiche WebLink
<br />002871 <br /> <br />0% <br /> <br />Septembe~, October and December of 1982 fo~ various <br />project components. <br /> <br />6. The Amount Claimed: <br /> <br />A. UNION-ANTERO CONDUIT:' 450 cubic feet per second - <br />conditional <br /> <br />, <br /> <br />5. <br /> <br />WILLOW CREEK DIVERSIO~: <br />conditional <br /> <br />3~0 cubic fee~ per second - <br /> <br />C. TAYLOR RIVER DIVERSION AT TAYLOR PARK RESERVOIR: 1,000 <br />cubic feet per second - conditional. (Diversion from <br />Taylor Park Reservoir will be through a tunnel and <br />pumping plant to Union Park Reservoir.) <br /> <br />D, <br /> <br />UNION PARK RESERVOIR: 900,000 acre feet. Total <br />maximum aCDroDriation for the entire unified and <br />interdependent facility is 900,000 acre feet per year. <br />All points of diversion are in Gunnison County, <br />Colorado. Reservoir to .be filled and refilled so as to <br />achieve this maximum annual amount. <br /> <br />)r <br /> <br />7. Proposed Use: <br /> <br />The following uses are proposed for the entire 900,000 ac~e <br />foot integrated facility: municipal pU~poses, including fire <br />p~o~ec~ion, ir~igation of la~ns, gardens and parks, in priva~e <br />and ~~nicipal :acilities. Dcmestic, co~mercial and i~d~st~ial. <br />use, rec~e2~ic~al purposes: ~ish and ~ild2ife ~~c?a;a~ion, <br />rese~voir evepora~io~ replace~e~~1 end hydroelec~ri= pu~poses. <br />Those ~aters tra~spor~ed ou~-of-basin will be ~sed, r&used, <br />successively used and used to exti~ction v!ithi~ the So~th Pla~te <br />River basin and the Arkansas Rive~ basin. <br /> <br />8. Previous Adjudications: <br /> <br />Union Park Reservoir was dec~eed by the Water <br />Division 4, on June 14, 1934, in Case No. 82CW340. <br />adjudication was for 325,000 acre feet of wate~ ~o <br />pa=t of the Union Pa=k Hyd~oelectric Project. <br /> <br />Court, Water <br />The <br />be used as <br /> <br />, ,.". <br /> <br />E C8J80033 <br /> <br />ij~ <br />