|
<br />'.
<br />
<br />f\)
<br />W
<br />I-'
<br />::..if
<br />
<br />.
<br />
<br />.
<br />
<br />Feed water solids 1/
<br />Feed water iron 1/
<br />Feed water calcium 1/
<br />Product water solids 2/
<br />Feed water temperature 3/
<br />Sea water intake pumping head
<br />Underwater intake length
<br />Underwater brine disposal length
<br />
<br />32,606
<br />0.02
<br />400
<br />713
<br />550
<br />120.8
<br />2,200
<br />13 , 500
<br />
<br />p/m
<br />p/m
<br />p/m
<br />p/m
<br />F
<br />ft
<br />ft
<br />ft
<br />
<br />100-year cost centers
<br />Sea water intake/brine outfall
<br />Product pumping plant
<br />Pipelines
<br />
<br />$11,202,000
<br />999,000
<br />6,412,000
<br />
<br />$18,613,000
<br />
<br />Subtotal
<br />
<br />Interest during construction
<br />Start-up costs
<br />Owners general expense
<br />
<br />1,693,000
<br />19,000
<br />1,395,000
<br />
<br />$21 ,720,000
<br />
<br />INVESTMENT (100 Year)
<br />
<br />30-year cost centers
<br />Desalting plant
<br />Steam supply
<br />General site development
<br />
<br />$62,918,000
<br />6,478,000
<br />1,636,000
<br />
<br />$71,032,000
<br />
<br />6,463,000
<br />1,390,000
<br />5,325,000
<br />
<br />$84,210,000
<br />
<br />Subtotal
<br />
<br />Interest during construction
<br />Start-up costs
<br />Owners general expense
<br />
<br />INVESTMENT (30 Year)
<br />
<br />Land cost
<br />Product water pipeline
<br />
<br />4,475,000
<br />8,200,000
<br />
<br />$118,605,000
<br />
<br />TOTAL INVESTMENT
<br />
<br />y
<br />?/
<br />2./
<br />
<br />Handbook of Chemistry and Physics; Student 44th Edition, The
<br />Chemical Rubber Company, p. 3,488.
<br />36th Annual Report; Metropolitan Water District of Southern
<br />California, Table 19, p. 45.
<br />An Engineering and Cost Study of a Dual Purpose Water Desalting-
<br />Electric Powerplant for the Santa Barbara Channel Coast, California;
<br />Bureau of Reclamation, Oceanography Section, May 1967, p. 2.
<br />
<br />17
<br />
|