Laserfiche WebLink
<br />'. <br /> <br />f\) <br />W <br />I-' <br />::..if <br /> <br />. <br /> <br />. <br /> <br />Feed water solids 1/ <br />Feed water iron 1/ <br />Feed water calcium 1/ <br />Product water solids 2/ <br />Feed water temperature 3/ <br />Sea water intake pumping head <br />Underwater intake length <br />Underwater brine disposal length <br /> <br />32,606 <br />0.02 <br />400 <br />713 <br />550 <br />120.8 <br />2,200 <br />13 , 500 <br /> <br />p/m <br />p/m <br />p/m <br />p/m <br />F <br />ft <br />ft <br />ft <br /> <br />100-year cost centers <br />Sea water intake/brine outfall <br />Product pumping plant <br />Pipelines <br /> <br />$11,202,000 <br />999,000 <br />6,412,000 <br /> <br />$18,613,000 <br /> <br />Subtotal <br /> <br />Interest during construction <br />Start-up costs <br />Owners general expense <br /> <br />1,693,000 <br />19,000 <br />1,395,000 <br /> <br />$21 ,720,000 <br /> <br />INVESTMENT (100 Year) <br /> <br />30-year cost centers <br />Desalting plant <br />Steam supply <br />General site development <br /> <br />$62,918,000 <br />6,478,000 <br />1,636,000 <br /> <br />$71,032,000 <br /> <br />6,463,000 <br />1,390,000 <br />5,325,000 <br /> <br />$84,210,000 <br /> <br />Subtotal <br /> <br />Interest during construction <br />Start-up costs <br />Owners general expense <br /> <br />INVESTMENT (30 Year) <br /> <br />Land cost <br />Product water pipeline <br /> <br />4,475,000 <br />8,200,000 <br /> <br />$118,605,000 <br /> <br />TOTAL INVESTMENT <br /> <br />y <br />?/ <br />2./ <br /> <br />Handbook of Chemistry and Physics; Student 44th Edition, The <br />Chemical Rubber Company, p. 3,488. <br />36th Annual Report; Metropolitan Water District of Southern <br />California, Table 19, p. 45. <br />An Engineering and Cost Study of a Dual Purpose Water Desalting- <br />Electric Powerplant for the Santa Barbara Channel Coast, California; <br />Bureau of Reclamation, Oceanography Section, May 1967, p. 2. <br /> <br />17 <br />