My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07192
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:11 PM
Creation date
10/12/2006 2:10:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
12/1/1962
Author
unknown
Title
Ruedi-Western Slope Investigations Colorado Reconnaisance Reports on Basalt and Bluestone Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />084'9 <br /> <br />. <br /> <br />INTRODUCTION <br /> <br />. <br /> <br />In the initial feasibility report on the Fryingpan-Arkansas project, <br />prepared by the Bureau of Reclamation and printed as House Document No. <br />187, 83rd Congress, a 28,OOO-acre-foot capacity reservoir at the Aspen <br />site on Roaring Fork was proposed to provide replacement storage for the <br />western slope. As a result of extensive studies of alternative sites and <br />conferences among all. interests in Colorado and concerned Federal agen- <br />cies, the plan was changed to include the larger Ruedi Reservoir instead <br />of the Aspen Reservoir. A supplemental report by the Bureau of Reclama- <br />tion on the Ruedi Dam and Reservoir was printed as House Document No. 353, <br />86th Congress, 2d Session. The ~relindnary cost estimate for the dam <br />and reservoir shown in the supplemental report, based on January 1959 <br />prices, is $12,831,OOO. <br /> <br />The cost of the originally proposed Aspen Dam and Reservoir was esti- <br />mated at $7,600,000. The FlJ'ingpan-Arkansas project was analyzed and <br />justified on the basis of this cost for replacement storage. Since the <br />Ruedi Reservoir will perform the s~e replacement function, that amount <br />was assigned in the supplemental report as a Fryingpan-Arkansas project <br />cost, leaving $5,231,000 of the cost of Ruedi Dam and Reservoir to be <br />allocated among future project purposes on the western slope. This <br />assignment is in accordance with ~rinciple 3 of the operating principles <br />previously mentioned. 'lnterest during construction was estimated in the <br />supplemental report at $664,000 and annual operation and maintena~ce costs <br />were estimated at 019,700, including $IO,500 for recreational facilities. <br /> <br />The operating principles provide that operation and maintenance <br />costs of Ruedi Reservoir shall be borne by eastern and western slope <br />water users in such proportions as may be determined by the Secretary of <br />the Interior. Assuming that the Secretary deternines that operation and <br />maintenance costs and costs of interest during con~truction shall be <br />dhLrlbuted. -iff-tliesomenproportions as construction costs as outlined <br />above, the assignment of all costs and amounts reimbursable would be as <br />shown in the following tabulation. <br /> <br />. <br /> <br />~ <br />Total, Ruedi Dan and Reservoir <br />Assigned to Fryingpan-Arkansas <br />project <br />Remaining western slope costs <br />Less nonreimbursable costall <br />Flood control 117,500 6,000 100 <br />Fish and wildlife 1,757,1300 90,200 1,300 <br />Recreation 55.000 10.500 <br />Subtotal 1.930.300 96.200 11.900 <br />Reimbursable cost 3,300,700 169,400 2,300 <br />11 TIle tentative allocation of nonreimbursable construction costs <br />to project purposes taken from supplemental report on Ruedi Dam and <br />Reservoir, H. D. 353, 86th Congress, 2d Session. <br /> <br />Cons tructi on <br />cost <br />$12,83I,OOO <br /> <br />Interest <br />during <br />construc- <br />tion <br />$664,000 <br /> <br />Annual <br />operation <br />and <br />maintenance <br />$19,700 <br /> <br />7.600.000 <br />5,23l,OOO <br /> <br />398.400 <br />265,600 <br /> <br />5.500 <br />14,200 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.