My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07192
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:11 PM
Creation date
10/12/2006 2:10:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
12/1/1962
Author
unknown
Title
Ruedi-Western Slope Investigations Colorado Reconnaisance Reports on Basalt and Bluestone Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />08~5 <br /> <br />SUl~ARY SHEETS (Continued) <br /> <br />Bluestone Project <br /> <br />PROJECT FEATURES <br /> <br />Sharrerd Parl<: Pumping Plents and Canal <br /> <br />Pump <br />..E.Q..:. <br />I <br />2 <br />3 <br /> <br />Canal <br />Length (mi.) . . . . . . . . <br />Initial capacity (sec.-ft.) <br /> <br />Una Diversion DanJ <br /> <br />Ty',pe . . . . . . . . . . . . <br />Height above streambed (ft.) <br />Crest length (ft.) ..... <br /> <br />. <br /> <br />. <br /> <br />Una Po""er Canal <br />LenJtG (miles) ... <br />Capacity (sec.-ft.) <br /> <br />Una Powerplant <br />Inst~lled capacity (kw) . <br />Average annual equivalent <br /> <br />Capaci ty <br />(sec.-ft. ) <br />30 <br />25 <br />15 <br /> <br />. <br /> <br />. . . . <br /> <br />. . <br /> <br />. Earth and <br /> <br />. <br /> <br />. . . . . <br /> <br />. . . . . . . . . . . . <br /> <br />generation (1,000 kwh) <br /> <br />Una PU!!lPini' Plant _ ___._________ <br />~apeclty lsec;-ft.J <br />Lift (ft.) ............... <br /> <br />Una Pump Canal <br />Length (mi.) ....... <br />Initial capacity (sec.-ft.) <br /> <br />Mt. Lcgan Reservoir <br />Capacity (ac.-ft.) <br /> <br />. . . . . . II . . . . . . . . . . <br /> <br />RENARKS <br /> <br />Lift <br />(~) <br />150 <br />160 <br />400 <br /> <br />7.1 <br />30 <br /> <br />concrete <br />0-24 <br />240 <br /> <br />4.4 <br />1,955 <br /> <br />7,620 <br />56,345 <br /> <br />65 <br />425 <br /> <br />17 <br />65 <br /> <br />1,500 <br /> <br />The Bluestone "Jater Consen'ancy District "ill be organized to serve <br />as a contracting and administrative agency for the project. <br /> <br />The project, if detailed studies indicate it to be feaSible, will <br />be proposed as a participatin~ project with the Colorado River <br />Storage project. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.