Laserfiche WebLink
<br /> <br />Principal project Measures: <br /> <br />It is expected that 80 long-term land treatment <br />contracts will be written during the project's life. <br />Approximately 58,000 acres will be treated through project <br />action. <br /> <br />PROPOSED PRACTICE LIST TABLE <br /> <br />Practice number and name <br /> <br />I units I Extent <br /> <br />314 <br />342 <br />350E <br />350R <br />350P <br />352 <br />362 <br />378 <br />382 <br />410 <br />449 <br />510 <br />512 <br />516 <br />528 <br />530 <br />550 <br />556 <br />561 <br />574 <br />614 <br />642 <br />590 <br />595 <br /> <br />Project Costs: <br /> <br />Brush Management <br />critical Area planting <br />Sediment Basin (earthen) <br />Sediment Basin (rock) <br />Sediment Basin (post) <br />Deferred Grazing <br />Diversion <br />Pond <br />Fencing <br />Grade Stabilization structure <br />Irrigation Water Management <br />Pasture & Hayland Management <br />Pasture & Hayland Planting <br />Pipeline <br />Proper Grazing Use <br />Proper Woodland Grazing <br />Range Seeding <br />Planned Grazing System <br />Heavy Use Area Protection <br />Spring Development <br />Trough. or TanJ<;; <br />Well <br />Nutrient Management <br />Pest Management <br /> <br />300 <br />478 <br />203 <br />748 <br />161 <br />46,935 <br />5,372 <br />6 <br />30 <br />6 <br />232. <br />555 <br />400 <br />66,166 <br />46,935 <br />10,430 <br />310 <br />46,380 <br />10 <br />6 <br />33 <br />4 <br />232 <br />232 <br /> <br />Ac. <br />Ac. <br />No. <br />No. <br />No. <br />Ac. <br />L.F. <br />No. <br />Mi. <br />No. <br />Ac. <br />Ac. <br />Ac. <br />L.F. <br />Ac. <br />Ac. <br />Ac. <br />Ac. <br />Ac. <br />No. <br />No. <br />No. <br />.AC. <br />AC. <br /> <br /> <br />PL-566 Funds Other Funds <br /> <br />Total <br /> <br />Land Treatment Measures: <br /> <br />Management practices: <br />Deferred Grazing $70,400 $0 $70,400 <br />Enduring Practices: <br />Sediment Basin $363,300 $164,000 $527,300 <br />Diversion $16,900 $7,600 $24,500 <br />Stockwater Developments $33,000 $33,000 $66,000 <br />Fencing $21,400 $21,400 $42,800 <br />Grade Stabilization <br />Structure $17,200 $7,800 $25,000 <br />Pipeline $24,800 $24,800 $49,600 <br />Range seeding $10,100 $10,100 $20,200 <br /> <br />4 <br />