My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07175
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:08 PM
Creation date
10/12/2006 2:09:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1993
Author
DOI-BOR
Title
Scoping Report for the Gunnison River Contract - Water from Blue Mesa Reservoir through the Black Canyon and the Gunnison Gorge
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br /> <br />a <br />. <br />. <br />i~ <br />1i <br />A <br />tl <br />~J <br />i <br />'. <br />"~ <br />" <br />I <br />1 <br /> <br />.! <br /> <br />n,~ 't~(t, <br />,,,. ... <br /> <br />SCOPING REpORT <br />GUNNISON RIvER CONTRACT <br /> <br />CHAPTER 1. INTRODUCTION <br /> <br />A. Background <br /> <br />In the 1982 Colorado State water rights adjudication of the United States v. Denver, 656 <br />P.2d I, the Black Canyon of the Gunnison National Monument (Black Canyon) was decreed <br />a conditional, Federal reserved instream flow water right on the Gunnison River with a 1933 <br />priority date. A proposal to supply water to the Black Canyon by means of a water delivery <br />contract from the Federal Reclamation project reservoirs of the Wayne N. Aspinall Unit <br />(Aspinall Unit), located immediately upstream from the Black Canyon, was stimulated by the <br />need to quantify that right and proposals to develop large amounts of water in the Gunnison <br />River Basin, In January 1991, the Bureau of Reclamation (BaR), National Park Service <br />(NPS), Bureau of Land Management (BLM), and Colorado Water Conservation Board <br />(CWCB) began examining the possibility of providing a long-term water supply to the Black <br />Canyon and the downstream Gunnison Gorge from Blue Mesa Reservoir. It was agreed that <br />such a contract shou'ld be seriously considered, and the agencies' intent to pursue negotiating <br />a water delivery contract was announced by BaR's Commissioner in December 1991. <br /> <br />To initiate activities ,under the National Environmental Policy Act (NEPA), scoping for the <br />contract proposal commenced in the spring of 1992 and involved participation by each of the <br />above agencies. Also in the spring, BaR began providing flows from the Aspinall Unit to <br />assist in studies on the effects of the Aspinall Unit operation on downstream endangered fish, <br />pursuant to Section 7 of the Endangered Species Act and the "Recovery Implementatipn <br />Program for Endangered Fish Species in the Upper Colorado River Basin." The goal pf this <br />program is to recover the endangered Colorado squawfish, razorback sucker, humpback <br />chub, and bonytail chub in the Colorado River and its tributaries such as the Gunnison River. <br />Historically, these species were known to have occurred in the GunnisonRiver, primarily <br />below its confluence with the Uncompahgre River at Delta, Colorado and downstream from <br />both the Black Canyon and the Gunnison Gorge. The Fish and Wildlife Service (FWS) <br />participated in the scoping effort to help address questions relevant to endangered fish issues, <br /> <br />Formerly the Curecanti Unit, the Aspinall Unit was authorized by the 1956 Colorado River <br />Storage Project Act. The Aspinall Unit assists Colorado and the other,Upper Basin States <br />(Utah, Wyoming, New Mexico) in utilizing their apportionment of Colorado River water <br />while meeting obligations to deliver water to the Lower Basin States (California, Arizona, <br />Nevada, and New Mexico) and Mexico, as agreed to by the 1922 Colorado River Compact <br />and the 1948 Upper Colorado River Basin Compact (Compact entitlement). The Aspinall <br />Unit developed the water storage and hydroelectric power generating potential along a 40- <br />mile section of the Gunnison River by the construction of three dams and powerplants: Blue <br />Mesa, Morrow Point, and Crystal. The dams and powerplants of the three reservoirs are <br />
The URL can be used to link to this page
Your browser does not support the video tag.