Laserfiche WebLink
<br /> <br />F. Cumulative Impacts <br /> <br />Item 19.' <br /> <br />Related,Projects/Proposals - Address cumulative impacts on resources and <br />related projects when this action is considered with other proposed and existing <br />water projects and legislative designations, ' <br /> <br />. Refer to: Gunnison meetings; the City of Colorado Springs; Mr. Clark; CREDA; CRWCD; <br />, EPA; theNPCA; Non-Federal Parties to the 1975 Exchange Agreement. (49 comments) <br /> <br />Numerous respondents requested an analysis of how other proposed water projects would affect <br />various elements when considered in combination with the proposed water delivery contract. <br />" Projects mentioned included ABLateral, transbasin diversions, Rocky Point, Union Park, Dallas <br />, Creek, Arapahoe County, City of Aurora, Red lands Diversion, Uncompahgre,Paonia, Smith <br />Fork, Bostwick Park, Fruitgrowers, and Dominguez, Elements discussed included water supply, <br />recreation releases, endangered fish, trout and native fisheries, ,and local,county, and basin <br />economies. <br /> <br />COncellls were also expressed on the effects of the contract on proposed legislationto designate <br />the Gunniso!l as a Wild and Scenic Iliver, redesignate BlackCal:iyon asa natiortalpark; and, <br />establish a National Conservation Area in the Gunnison Gorge, <br /> <br />IV. UNAVOIDABLE IMPACTS AND MITIGATION. <br /> <br />During public' meetings and, included in several written comments were ideas. and questions' <br />concerning the potential mitigation problems that might occur under the contract., <br /> <br />Item to. <br /> <br />Mitigation - Identifypotential unavoidable impacts and need for mitigation, <br /> <br />Refer to: ,Gunnison, Montrose, and Delta meetings; Mr. Butterfield; CREDA; CRWCD; Mr, <br />Hinchmatl; Montrose Economic Development Council; Montrose' CountyComlllissioners, (17 <br />comments), <br /> <br />In Gunnison, it was asked how Morrow Point and Crystal Reservoirs could be operated to , <br />mitigate eff~ts of CO!ltract releases, Gunnison and Montrose meeting participants and the <br />Montrose EconOmic' Development Council questioned' if operational changes would cause <br />stl11ctural damage, increase operation and maintenance costs, or:increase erosion problems at <br />Crystal Dam, Morrow Point Dam, the ,Gunnison Tunnel, or other gownstrealll Structures, If so, <br />they asked how these impacts would be mitigated and paid for. <br /> <br />One participant in Montrose asked whether Ilidgway Reservoir of the DallaS CreekProjectcould <br />furnish water to downstream endangered fish species, Another participantsuggested that better <br />water monitoring could result in more efficient water use, Several suggestions were made that <br /> <br />34 <br />