Laserfiche WebLink
<br />o <br />CJ1 <br />l'\.) <br />o <br /> <br />WATER RESOURCE APPRAISALS <br />FOR HYDROELECTR I C <br /> <br />LICENSING <br /> <br />PLANNING STATUS REPORT <br /> <br />This is one of a series of Planning Status Reports being pre- <br />pared for major river basins in the Unite-d States. These reports <br />constitute the first step in a program of water resource appraisals <br />for hydroelectric licensing. They are prepared hy the Bureau <br />of Power of the Federal ,Power Commission to identify those <br />basins most in need of additional planning studies to provide <br />information needed by the' Commission in its hydroelectric li- <br />censing and other work. The Planning' Status Reports show <br />data on existing watBr resource developments and known po- <br />tentials, summarize the license status of non-Federal hydro- <br />electric developments, review pa'St and current planning,studies, <br />and identify the needs for additional planning. The information <br />presented in these reports is abstracted from available sources <br />and its assembly involves no new studies. <br /> <br />FEDERAL POWER <br />BUREAU <br /> <br />COMMISSION <br />OF POWER <br /> <br />.,SB6 <br />