My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07142
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:55 PM
Creation date
10/12/2006 2:06:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
4/1/1952
Author
Nat'l Park Serv
Title
Planning Report of Recreation Use and Development - Willow Creek Reservoir - CBT Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br /> <br />B. Cost of Administration, Operation and Maintenance <br /> <br />( ') <br /> <br />1. <br /> <br />Personnel <br /> <br />1 truck driver-larorer <br /> <br />$ 500 per season <br /> <br />t- <br />c.n <br />(Jl <br />t~ <br /> <br />2. <br /> <br />Materi1l1s & Supplies <br /> <br />500 per sea ro n <br /> <br />3. <br /> <br />Equipment rental <br /> <br />Road grader <br /> <br />500 per season <br /> <br />Total recurring co sts <br /> <br />$1:500 <br /> <br />4. E~ulE1!!;:!2."L~~1 Initial. <br /> <br />Pick-up t.ru(~k <br /> <br />1,200 <br /> <br />Boa t .c.i th mot.or <br /> <br />1,200 <br />~2 ,1,(>0 <br /> <br />c. Er..C?!.ec tj..:~~ <br /> <br />Fire> provention must be considered when locating camp and picnic <br /> <br />si tes. In order tJ cOntrol. such practices during the period of high f:ire <br /> <br />hazard coniitions, the building of fires may have to be prohibited. <br /> <br />Boatirg regulations should be posted. <br /> <br />'.,.,' <br /> <br />VII FUR'IHER PLANNING <br /> <br />Further detailed planning will be re<:p ired for all features <br /> <br />of the development before arw construction can be initil'!ted. Field <br /> <br />surveys must precede any further planning activity. <br /> <br />Before the Bureau of Reclamation initiates construction on the <br /> <br />access road through the Public Use Area it is suggested that the National. <br /> <br />Park Service be given the opportunity to assist this agency in establishing <br /> <br />final location, alignment and grade. <br /> <br />..:.......-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.