My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07139
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:55 PM
Creation date
10/12/2006 2:06:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.750
Description
San Juan River General
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Western Research Cor
Title
Economic Analysis of Potentially Irrigable Parcels in the San Juan Watershed - June 1987
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />,',,\.'" <br /> <br />" . <br /> <br />A, ,., <br /> <br />001422 <br /> <br />, <br />,',l ,..: <br /> <br />. ",,' .~ <br />4.0 Farm Efficiency Adjustments <br />The Level A analysis crop budgets assume farm efficiencies equal <br />to that of a contiguous 1016 acre operation. That is, it was assumed <br />that at least 1016 acres could be farmed using one equipment <br />complement stored in a central equipment warehouse without excessive <br />transportation costs. In the Level B economic analysis, two types of <br />farm efficiency adjustments were made for certain parcels. The first <br />adjustment was for economies of scale where there were fewer than 600 <br />acres of current or newly irrigated new acreage that could be farmed <br />as one unit. The 600 acre cutoff figure was used because economies of <br />scale decline rather steeply below this point. <br />A second type of adjustment for some parcels involved <br />transportation costs for on-farm equipment. These adjustments were <br />made in cases where isolated parcels could not be easily served out of <br />a central equipment warehouse. In cases where individual parcels were <br />more than five miles from the assumed location of a central equipment <br />warehouse, an additional transportation charge was incorporated for <br />transporting equipment to and from a central location. The effects of <br />these adjustments on the parcels identified as preliminary PIA in the <br />San Juan Watershed are described in the following sections. <br />5.0 Results of Level B Analysis for the San Juan Watershed <br />Boyle Engineering's Task 0 and E Report for the San Juan <br />Watershed, dated August, 1986, identifies two currently unirrigated <br />parcels as having positive residual repayment capacities. That is, <br />these parcels show positive returns after subtracting the costs of <br /> <br />5 <br /> <br />~, ,'~; <br />
The URL can be used to link to this page
Your browser does not support the video tag.