Laserfiche WebLink
<br /> <br />e <br /> <br />e <br /> <br />00302~ <br /> <br />~, <br /> <br /> General <br /> Assembly <br /> Governor <br /> I <br /> Colorado River <br /> Commissioner <br /> I <br /> r LeEal Advisory <br /> Ornffiltlee <br /> DNR <br /> Executive Director <br /> I <br /> CWCS SEO <br /> .~ + <br />Colorado River Policy ................................................................ Colorado River OSS <br />Advisory Council Advisory Committee <br /> ONR - Project <br /> Management Team <br /> r I I <br /> CWCS OWR Consultants/ <br /> Staff Staff Expens <br /> <br />Figure 1: Colorado River Matters - Organi7.ation <br /> <br />The Information Management Commission is charged with the review and <br />coordination of information processing applications. As such it has established <br />guide lines for the preparation of system feasibility studies, The main text of <br />this repon reflects the results of a feasibility study regarding the development <br />andtontinuing operation and maintenance,of a.CRDSS as specified,above. It <br />contains an inventory of the various needs for such a system as communicated <br />by a wide variety of water users and specifies the models. data, user interfaces, <br /> <br />DAMES&MOORE/CADSWES-3 <br />