Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />.4 .' <br /> <br />00303i <br /> <br />. Sets up a virgin nver flow database for various hydrologic <br />scenarios, <br /> <br />. Data: <br /> <br />- water rights tabulations (conditional and perfected) and their <br />priorities, <br />- consumptive uses of all water rights (monthly) <br /> <br />. The accounting model maintains and "active" list of water rights. <br />perfected or assumed to be developed under a defined water rights <br />scenario. It stans with natural flows. then allocates the water <br />according to the water rights priorities. For a specified node (water <br />right with location) and priority, the accounting model can give the <br />monthly hydrograph of physically avaiIable water, The "active" <br />water rights are perfected and conditional rights. <br /> <br />Utility: Automation of Running of Monthly Accounting Model <br /> <br />Can go through water rights tabulations (perfected and conditional) and add to <br />the "active" lisI each water right for which there is water physically available) <br /> <br />Replacement Reservoir Operations <br /> <br />Scenario Reference: Water Rights Administration <br /> <br />Functional Specifications: <br /> <br />. Daily time step. <br /> <br />. This is a replacement reservoir utility which is required by USBR <br />for the Green Mountain Reservoir. A similar model could be used <br />for other replacement reservoirs as needed, <br /> <br />. <br /> <br />This model exists now as a spreadsheet. and is under development <br />by the USBR in Loveland. <br /> <br />Assume the model exists; automate putting data into it. <br /> <br />. <br /> <br />River Forecasting <br /> <br />Scenario Reference: Water Rights Administration 3.4 <br />Functional Specifications: <br /> <br />. <br /> <br />Time Step: daily <br />-Routing' <br />- Confidence limits (min, max, most probable) according to inflows <br /> <br />DAMES& MOORE/CADSWES- 18 <br />