Laserfiche WebLink
<br />/ <br /> <br /> <br />. Acquire the latest version of the USBR's River Simulation System <br />(RSS) model configured for the Colorado River (which initially is <br />not expected to be fully operational or comparable to CRSM) and <br />initiate training, <br /> <br />. Enter into an MOU with the USBR to develop additional features to <br />RSS in cooperation with Colorado to give RSS full functionality <br />and the same capability as CRSM, The feaIures to be incorporated <br />in year 1 include rule base development. analysis of multiple <br />hydrologic traces, and National Weather Service forecasts, <br /> <br />. Develop' a consumptive use model sufficient for checking USBR ' <br />consumptive uses and losses report. <br /> <br />. Perform a detailed design and initial development of a water rights <br />planning model based on a monthly time step. <br /> <br />. Initiate documentation of the database and CRDSS design efforts. <br /> <br />Year 2 (FY 94-95) <br /> <br />Continue database collection under the MOU with USBR. <br /> <br />Continue database constrUction for additional models and <br />applications, <br /> <br />Complete quality check of diversion records for the period from <br />1975 to the present for Divisions 4,5,6. and 7, <br /> <br />Incorporate enhancements to RSS software developed by USBR in <br />cooperation with Colorado for rule processing, stochastic flow <br />generation. and salinity, <br /> <br />Complete development of consumptive use model. <br /> <br />Develop and calibrate the water rights planning model. <br /> <br />Initiate development of an analysis system for multi-criteria <br />evaluation, network analysis. and statistical analysis. <br /> <br /> . <br /> . <br />,e . <br /> . <br /> <br />e <br /> <br />00'3024 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Continue documentation and training for additional models, <br /> <br />Year 3 (FY 95-96) <br /> <br />. Continue database collection under the MOU with USBR. <br /> <br />. Continue database constrUction for additional models and <br />applications. <br /> <br />. Initiate development of models for stochastic flow generation, river <br />flow forecasting and flow partitioning. <br /> <br />. Initiate development of status and reporting software for data <br />viewing, <br /> <br />. Acquire model for water rights administration similar to the South <br />Platte River Operations model. <br /> <br />DAMES& MOORE/CADSWES-6 <br />