My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07131
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:52 PM
Creation date
10/12/2006 2:06:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.107.A
Description
Basalt Participating Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1962
Title
Summary Sheets - Basalt Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f <br />\. <br /> <br />Sill'~Y SHEETS (Continued) <br /> <br />Basalt Project <br /> <br />PROJECT FEATURES <br /> <br />Missouri Heil'hts Dam and Reservoir enlar"ement <br />Type of dam . . . . . . . . . . . . . . . . <br />Proposed increases: <br />Dam height above streambed (feet) ..... <br />Dam crest length (f't.) . . . . . . . . . . . <br />Reservoir capacity (acre-feet) total. . .,. <br />Reservoir capacity (acre-feet) active <br /> <br />Earth- and rock-fill <br />From To <br />--g -67 <br />1.600 3.400 <br />2.800 21.500 <br />2.600 21.300 <br /> <br />Basalt Conduit <br /> <br />Le."1gth ( m.i . ) .......... <br />Initial capacity (sec.-ft.) . . . <br /> <br />. . . <br /> <br />. . . . <br /> <br />. . . . . <br /> <br />.. 22 <br />! . 100 <br /> <br />. . . <br /> <br />. . . . <br /> <br />..... <br /> <br />Landis Canal <br /> <br />Length (mi.) .... _I . . . . . . <br />Initial capacity (sec.-ft.) . . . . <br /> <br />. . <br /> <br />. . . <br /> <br />. . . . . . . <br /> <br />22.8 <br />220 <br /> <br />. . <br /> <br />. . . <br /> <br />. . . . . . . <br /> <br />Spring Valler Lateral - <br />Length (mi.) ....... <br />Initial capacity (sec.-ft.) <br /> <br />. . . . . . . . . . .-,. <br /> <br />. A <br /> <br />. . . 2.8 <br />. .. 50 <br /> <br />. . . . . . . . . . . . <br /> <br />. . <br /> <br />'-- <br /> <br />Carbondale Canal <br /> <br />Length (mi.) ..... tl- . . . . . . . . <br />Initial capacity (sec.-ft.) . . . . . . <br /> <br />. . . <br /> <br />. . ... . . . . <br /> <br />12.6 <br />55 <br /> <br />. . . <br /> <br />. . . . . . . <br /> <br />Sopris Canal <br /> <br />Length (mi.) ................. <br />Initial capacity (sec.-ft.) . . . . . . <br /> <br />. ... . . ... <br /> <br />. . . . . . 8.3 <br />. . . . .. 25 <br /> <br />. . ... ... ... <br /> <br />REMARKS <br /> <br />);4.s je",Y-l <br />A water conservancy district -Jill ea organized to serve as a con- <br />tracting and administrative agenc~f for the project. <br /> <br />The project. if found feasible following detailed studies, will be <br />proposed as a participating project with the Colorado River Stor- <br />age project <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.