Laserfiche WebLink
<br />~ <br />.,.-1 <br />~ <br />,aoj <br />(~._'i <br />~) <br /> <br /> <br /><I <br />I <br /> <br />the total dissolved solids in such water exoeeds three hundred <br />fifty parts per million. <br /> <br />ARTICLE IV. <br /> <br />7he obligation of BewMexico to deliver water in the Rio <br />Grende at Sen Marcial, during eaoh oalendar :rear, exolusive 01' <br />the montlis of July, August, and Sept_ber, shall be that quentity <br />set torth in the tollowing tabulation of relationship, which <br />corresponds to the quantity at the upper index station. <br /> <br />DISClWlOE OF RIO GRANDE AT OTOWI BRIDGE AND AT SAN MARCIAL <br />EXCLUSIVE OF JULY, AUGUST AND SEPT!!.1!BER <br /> <br />Quanti ties in thoueands 01' acre teet <br /> <br />otowi Index Supply (5) <br /> <br />100 <br />200 <br />300 <br />400 <br />500 <br />600 <br />700 <br />800 <br />900 <br />1000 <br />1100 <br />1200 <br />1300 <br />1400 <br />1500 <br />1600 <br />1700 <br />1800 <br />1900 <br />2000 <br />2100 <br />2200 <br />2300 <br /> <br />San Marcial Index <br />supply (6) <br /> <br />o <br />65 <br />141 <br />219 <br />300 <br />383 <br />469 <br />557 <br />648 <br />742 <br />839 <br />939 <br />1042 <br />1148 <br />1257 <br />1370 <br />1489 <br />1608 <br />1730 <br />1856 <br />1985 <br />2117 <br />2253 <br /> <br />Intermediate quantities shall be computed by proportional parts. <br /> <br />(5) The Otowi Index Supply is the recorded tlow of the Rio <br />Orande at the U.S.O.S. gaging station at otowi Bridge near San <br />Ildetonso (formerly station near Buckman) during the calendar <br />year, exclusive of the flow during the months of July, August and <br />september, corrected for the operation of reservoirs constructed <br />after 1929 in the drainage basin of the Rio Grande between Lobatos <br />and Otowi Bridge. <br /> <br />(6) San Marcial Index Supply is the recorded tlow 01' the Rio <br />Orende at the gaging station at San Marcial during the calendar <br />year exclusive 01' the flow during the months of July, August and <br />september. <br /> <br />" <br />, <br /> <br />, <br />". <br /> <br />The application 01'. this schedule sliall be subject to the pro- <br />visions hereinafter set torth end appropriate adjustments shall be <br />made for (a) any change in location 01' gaging stationsl (b) depletion <br />