Laserfiche WebLink
<br />OC2196 <br /> <br />- 10 _ <br /> <br />TABLE 1 -- ESTIMATED PROJEcr INSTALLATION COST <br /> <br />Fishers Peak - Carbon Arroyos Watershed, Colorado <br /> <br />Item <br /> <br />Estimated Cost (Dollars 2 <br />N t b P. L. 566 Other , <br />o. 0 e <br />Unit 1/ A lied Funds Funds Total <br /> <br />LAND TREATMENT MEASURES <br /> <br /> Rangeland <br /> Proper Range Use Acre 770 1,170 1,170 <br /> Pasture Planting Acre 10 260 260 <br /> Grade Stabilization <br /> Structures Number 6 2,160 2,160 <br /> Farm Ponds Number 3 1,080 1,080 <br /> Technical Assistance 500 500 <br />TOTAL LAND TREATMENT ( SCS ) 5.170 5.170 <br />STRUcrURAL MEASURES <br /> Floodwater-Retarding <br /> Structure Number 2 154,668 154,668 <br /> Diversion L.Feet 2,000 2,438 2,438 <br /> Stream Channel Improvement L.Feet 1,234 40,758 40,758 <br />Subtotal - Construction 197,864 197,864 <br />Installation Services <br /> Engineering Services 27,702 27,702 <br /> Other 25,722 25,722 <br />Subtotal - Installation Services 53.424 53,424 <br />Other Costs <br /> Land, Easements, and Rights-of-way 11,565 11,565 <br /> Administration of Contracts 2,550 2,550 <br />Subtotal - Other 14.115 14.115 <br />TOTAL STRUCTURAL MEASURES (SCS) 251,288 14,115 265,403 <br />TorAL PROJEcr (scs) 251,288 19,285 270,573 <br />11 There are no Federal or State-owned lands involved. <br />~/ Price Base: 1960 Price Levels <br /> <br />Date: June 1960 <br /> <br /> <br />