My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07068
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:36 PM
Creation date
10/12/2006 2:04:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
5/15/1961
Author
US House of Represen
Title
Hearing before the Subcommittee on Irrigation and Reclamation of the Committee on Interior and Insular Affairs House of Representatives on H R 2206 H R 2207 H R 2208 and H R 2209
Water Supply Pro - Doc Type
Legislation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br /> <br />t <br /> <br />~~ti.', <br />, '... <br />. . <br />. l <br />I . ,~,' <br /> <br />~i::J&;; <br /> <br />FRYINGPAN-ARKANSAS PROJECT, COLORADO <br /> <br />11 <br /> <br />A summary of the assignment or Rnedi costs to the Frylngpan-Arkansa& <br />project follows: <br /> <br /> Prol~ctcost Interest Annual <br /> I"m durint: con- O.M. .. R. <br /> struction <br />Totnl Rucdl rosts____.__________________._________..__________ $12,831.000 $664,000 SUI,700 <br />Less nonreimbursable n.lloratlon9: <br />Flood cootrol________________.____________________________ 117,500 6,000 100 <br />Fish and will.lll[e___________._________________.____________ 1,757.800 00,200 ],300 <br />RecJ'('btlOD..___________________._________.________________ b5,OOO ------------- 10,500 <br />Bllhnce__________________________________._____.____..__ 10.00:1.700 5137,800 7,800 <br />AssllUlCd to Frymgpan-ArkansllS project: 7,600.000 398,4.00 <br />InWall)' f1$~igned___________._________._____________._____ 5,500 <br />Assigned in this8Dslysis___________._________.___________. 3,300, ;00 169,400 2,300 <br />TotoJ._.______..________________n______u______..______ 10,1100,;00 56;,800 7,800 <br /> <br />The amounts of additional Ruedi costs assigned to the Fryingpan-Arknnsas <br />project in tJlis study are the allocations to deferred municipal and industrial <br />water use as shown in the report on Ruedi Dam and Reservoir. For simplicity <br />of annly!':is. however, the total project costs of $10,900,700 were rounded to <br />$10,901,000. <br /> <br />Inte1.cijt dll1"ing const1"1lclion <br />OrigiTlfil calculatiou!'! of interest during construction were based OD the rate <br />of 2.;) perceut. In tbese studies two adjustments were wade. Firfit, the <br />$160,400 associated with tbe Ruedi M. & I. water allocation was added Rlld. sec- <br />ondly, the revised total was indexed to the rate of 2.632 percent, which is nr)- <br />plicuble for fi~cal year 1961 under the formula contained in the authorizing <br />bills aod the Water Supply Act of 1958. The adjustments follow: <br /> <br />Item <br />Towl interest during constroction as shown ill reevaluation state- <br />lDent__________________________________________________------- <br />Add Rlledi M. & 1. water allocatiOIL_____________________________ <br /> <br />Amount <br />$5, 449, (KJO <br />16:), 400 <br /> <br />Total based upon 2.5 percenL_____________________________ <br />Total adjusted to 2.632 percenL________________________________ <br /> <br />G.61S,400 <br />5.1)1;:;,000 <br /> <br />COST ALLOCATION <br /> <br />Project co!':t~. interest during construction. and anDual O.M. & R. costs are <br />allocnted concurrently by use of the separable costs-remaining benefits method. <br />The allocation is based upon a 50-year period of analysis and the interest rate <br />of 2.Ga2 percent; hence. annual benefits and O.M. & R. costs are capitalized on <br />this basis ill the allocation. Figures fur these Items are the same as contained <br />in the reevaluation statement except for replacement reserves whicb were revised <br />a3 previously explained. <br />Estimates of alternative single-purpose project costs also are the same as <br />used in the reevalnation statement except that the component of interest during <br />eonstruction of these alternates was adjusted from tbe interest rate of 2.5 <br />percent to 2,632 percent. Snch modification is not pertinent to power since <br />the alternate stenmplant values representing both benefits ond alternate costs <br /> <br />.\1: <br />
The URL can be used to link to this page
Your browser does not support the video tag.