Laserfiche WebLink
<br />000873 <br /> <br />"economically and technologically <br />feasible" apparendy is made by the <br />agency having oversight responsi- <br />bilities, but this has not prevented <br />the implemenradon of "reasonable <br />and prudent ahernatives" that have <br />had drastic economic effects. such <br />as those being imposed on federal <br />hydroelectric power operations in <br />the Pacific Norrhwest. There is no <br />evidence that the criterion that <br />reasonable and pruden< alterna- <br />tives be "economically" feasible has <br />any meaning in the application of <br />the Endangeted Species Ace. <br /> <br />Endangered Economic Health <br />The Endangered Species Act is the <br />most powerful environmental law <br />enacted by Congress. In reality. <br />any federal agency action affecting <br />a listed species is subordinated to <br />the act. Unprecedented discretion <br />is given the [wo agencies imple- <br />menting the act. the Fish and <br />Wildlife Service and ,he National <br />Marine Fisheries Service. There are <br />virtually no economic constraints <br />in implementing the act. <br />One of the great failures in <br />implementation of the Endan- <br />gered Species Act is the emphasis <br />on Secrions 7 and 9. which pro- <br />vide for enforcement of the act <br />against citizens otherwise engaged <br />in lawful activities. While CQnser- <br />vadon and recovery is the stated <br />goal of the act, the emphasis is on <br />enforcement. In fact, the COSt of <br />recovery has not even been esti- <br />mated for hundreds of listed spe- <br />cies. New species are being listed <br />without any indication of the fea- <br />sibiliry of recovery, much less the <br />COSt of recovery and delisting of <br />those species. <br />The Endangered Species Acr <br />was last reauthorized in 1987 for <br />a period of five years. I t was due <br />for reauthorizarion in 1992. Dur- <br /> <br />48 . PORUM jiJr Applil!'d Rt!uar~h .tfla Public Po/icy <br /> <br />ing the last nine years, several bills <br />have been introduced in both the <br />House and the Senate to reautho- <br />rize the act. Some of these bills have <br />attempted to address ,he problems <br />described above. Others have at- <br />tempred ro teinforce the existing <br />methods of implementing ,he act <br />or to make it even more stringent. <br />Few of these bills passed Senate or <br />House committees. and none was <br />enacted into law. There is no con- <br />sensus by a congressional major- <br />iry on what changes need ro be <br />made to rhe act. As a resulr, rhe <br />existing act remains rhe law of the <br />land. <br /> <br />Chronology o' Compromise <br />The Upper Colorado River Basin. <br />which is the watershed upstream <br />of Glen Canvon Dam, includes <br />more than 108.000 square miles <br />(280,000 square kilometets) of <br />drainage and thousands of miles <br />of rivers and srreams. Ir also in- <br />cludes 800 miles (1.300 kilome- <br />rers) of designated critical habitar <br />for four endangered fish species. <br />Water development and use in <br />the basin suPPOrtS irrigated agri- <br />culture, urban development, rec- <br />reation, fisheries, wildlife, and a <br />variety of industries. Transfer of <br />water OUt of the basin also su p- <br />plies municipal water for Salt Lake <br />City, Cheyenne, Denvet, Colorado <br />Springs, Albuquerque, and othet <br />urban areas in Utah. New Mexico, <br />and Colorado. <br />When the Endangered Species <br />Act was passed in 1973, the Colo- <br />rado squawfish-now the Colorado <br />pikeminnow-and rhe humpback <br />chub wete "grandfathered" as <br />original listed endangered species, <br />Two other Colorado River basin <br />species, the razorback sucker and <br />the bonyrail. were later added ro <br />the endangered species list, In the <br /> <br />lare 1970s, the Bureau of Recla- <br />mation began "consulting" with <br />the Fish and Wildlife Service on <br />the impacts of water projects on <br />endangered species, as required by <br />rhe Endangered Species Act. <br />Since ,har time, the Fish and <br />Wildlife Service has uniformly held <br />that water project depletions any- <br />where in the Upper Colorado River <br />Basin, including those deplerions <br />upstream of perrinent habicat, <br />"jeopardize" the endangered fish, <br />In the early 1980s, the Endan- <br />gered Species Act was applied to <br />nonfederaJ projects. In the incerim, <br />water users and the Upper Basin <br />states began to more fully under- <br />stand the implications of the En- <br />dangered Species Act; a decision <br />of the U.S, Supreme Court <br />brought consrrucrion of Tellico <br />Dam-a project of the Tennessee <br />Valley Authority-to a complete <br />halt due to potential impacts on <br />the snail darrer, an endangered <br />speCIes. <br />In July 1983, the Fish and <br />Wildlife Service developed a draft <br />report stating that the only way <br />for water projects in the Upper <br />Colorado River Basin to avoid jeop- <br />ardizing endangered fish species <br />was to replace all depletions on a <br />one~for-one basis. New projects <br />would have to double storage ca- <br />paciry and release one-half of the <br />deplerion to che scream to offset <br />the other one-half being used. This <br />req uiremen t would have made fu- <br />ture water developmenr infeasible. <br />It would have deprived the Upper <br />Basin states of water entirlement:s <br />provided for under inters[a[e com- <br />pacts that had been ratified by <br />Congress. <br />. Colorado Water Congress Spe- <br />cial Project. The draft report goe <br />the attention of the Upper Basin <br />stares and Upper Basin warer us- <br />