<br />DIVISION. OF WATER RESOURCES
<br />Room 435 State Capitol
<br />Salt Lake City, Utah 84114.
<br />
<br />. ~
<br />.~
<br />
<br />~~~Q1i~!.!L!!!!
<br />
<br />.June 27, 1975
<br />
<br />TO: DANIEL F. LAWRENCE
<br />PAUL L. GILLETTE
<br />
<br />~OM: BRYCE MONTGOMERY
<br />
<br />SUBJECT: EXPLORATION OF FOUNDATION AND BORROW MATERIALS FOR WHITE RIVER
<br />2-A DAM SITE,.UINTAH COUNTY
<br />
<br />Attached to this memorandum are maps illustrating the locatioris of
<br />proposed drill holes and test pits, along with access routes to them, for
<br />the White River 2-A dam site. The locations with respect to land ownership
<br />are-also.shown.
<br />
<br />.....
<br />
<br />Since the spillway.for the dam is now tentatively planned for the north.
<br />(right) abutment, and because of the abrupt escarpment there, I have Rroposed
<br />three drill holes here. These holes will be inclined approximately 500 from
<br />horizontal in southerly and southwesterly direction. The depths or lengths
<br />will be between 250-400 feet, with a diameter no larger than NX (3-inch).
<br />
<br />At the south (left) abutment I propose two inclined .core holes, 500
<br />from horizontal, approximately. 200 feet deep of NX diameter be drilled in a
<br />northerly direction. .as shown on the detail map.
<br />
<br />Along the crest. of the dam near the centerline of the dam on the north
<br />and south sides of the White River I propose two vertical drill .holes
<br />approximately 100 feet deep. These holes should include.standard penetration.
<br />tests with a split-tube sampler, and if possible Dennison core samples at
<br />least 4 inches ~n diameter, within the alluvium. Bedrock drilling can be
<br />done with NX size coring bits.
<br />
<br />Access to the drill sites on top of the escarpments at both abutments
<br />can be reached with very little difficulty from existing roads, and by about
<br />~ quarter mile of additional off-road travel for each abutment. This is
<br />illustrated on one of the attached maps. . However, there is a relatively
<br />steep rise on each of these proposed accesses that will require all-wheel
<br />drive on the drilling rig truck. Otherwise, a short pull by caterpillar may
<br />be needed at these two places. No bulldozing will be needed, but a few rocks
<br />at the north abutment will need to be pryed out of the way by crowbar.
<br />
<br />f.~JS'
<br />1;>.:':;
<br />. ~:~.-'- ,~.
<br />~j;r!~',
<br />.'.:-'.:",-
<br />
<br />
<br />~
<br />
<br />..~\.S:.,
<br />...;......:
<br />
<br />G::~~;:;~
<br />;. ;:. :::~ ~
<br />}::~:.:}~ ,
<br />
<br />~!:,~!':[
<br />
<br />r....:........
<br />
<br />
<br />
<br />
<br />
<br />~h;>1
<br />.:~t~0:~
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />1'&'+1'
<br />
<br />I,
<br />
<br />/:..y.:i..~,:
<br />::.ii\~;::,:'
<br />;'\)::...;.:
<br />.-;:- ;....
<br />
<br />...::://:.:.:.
<br />
<br />...:,:':::."1-
<br />:.... '.-:'
<br />'.- ..:.'.
<br />.';'....:.......
<br />.:....,:..
<br />(:..::.;~~\::
<br />.:.; .;~:.:'.
<br />. .:.' ~'.:.'.:
<br />
<br />All of the drill holes will need to be water-pressure tested at least .....,...:
<br />
<br />;;~;~r~~ i~:;e:fa~~t:~~;;ed~amPles and cores need to be pre~erved and ti:~~~
<br />
<br />..~.~:~.::........:.~.'...~.~~~.:.;..:.......:.-:::.,..,.. .. .,."..... f r.. .., .:~'.r.~'~:'~ .' : '":'2. J.::;"" .>:;.........:..: :~.~:f :~.- )~~::< '. ..:.;.. . :~::'.:~~~.;: ..~:<,<.:: .~...:' ::.: ':.;. .., :~:.......~..._._.-..-..r..:....:.-..~.~...::.~.....>.:.":.:.'._.:; . ..;-'. ..:.: ....~.. '_ ..' .:.:;:r..,......:.:..~:...~...,......:~:.........~.:....,.,.,................,:..
<br />.,:...\;:-;.~i;;;~:..,;~...~_\,?t.~~.!;j::;: ;>:'>; <: ;; :.. ....':..: >..., .... ... ".:.';j<' ,>. "0:;'.. . ... . .. >.
<br />'.'~">.;:;"'.-:... ,. .- .....;.. ".'.,.~. ..'~. .:...',.. .'. ....:~.~...,-,":..::..:.--'..../ .:..-.?-~.~~;;...:~<::.;:-::::':~:
<br />
|