Laserfiche WebLink
<br />:'" -..: "., .....,- <br />..;..1 ,: _, V J <br /> <br />. <br /> <br />~. <br />"- <br /> <br />DIVISION. OF WATER RESOURCES <br />Room 435 State Capitol <br />Salt Lake City, Utah 84114. <br /> <br />. ~ <br />.~ <br /> <br />~~~Q1i~!.!L!!!! <br /> <br />.June 27, 1975 <br /> <br />TO: DANIEL F. LAWRENCE <br />PAUL L. GILLETTE <br /> <br />~OM: BRYCE MONTGOMERY <br /> <br />SUBJECT: EXPLORATION OF FOUNDATION AND BORROW MATERIALS FOR WHITE RIVER <br />2-A DAM SITE,.UINTAH COUNTY <br /> <br />Attached to this memorandum are maps illustrating the locatioris of <br />proposed drill holes and test pits, along with access routes to them, for <br />the White River 2-A dam site. The locations with respect to land ownership <br />are-also.shown. <br /> <br />..... <br /> <br />Since the spillway.for the dam is now tentatively planned for the north. <br />(right) abutment, and because of the abrupt escarpment there, I have Rroposed <br />three drill holes here. These holes will be inclined approximately 500 from <br />horizontal in southerly and southwesterly direction. The depths or lengths <br />will be between 250-400 feet, with a diameter no larger than NX (3-inch). <br /> <br />At the south (left) abutment I propose two inclined .core holes, 500 <br />from horizontal, approximately. 200 feet deep of NX diameter be drilled in a <br />northerly direction. .as shown on the detail map. <br /> <br />Along the crest. of the dam near the centerline of the dam on the north <br />and south sides of the White River I propose two vertical drill .holes <br />approximately 100 feet deep. These holes should include.standard penetration. <br />tests with a split-tube sampler, and if possible Dennison core samples at <br />least 4 inches ~n diameter, within the alluvium. Bedrock drilling can be <br />done with NX size coring bits. <br /> <br />Access to the drill sites on top of the escarpments at both abutments <br />can be reached with very little difficulty from existing roads, and by about <br />~ quarter mile of additional off-road travel for each abutment. This is <br />illustrated on one of the attached maps. . However, there is a relatively <br />steep rise on each of these proposed accesses that will require all-wheel <br />drive on the drilling rig truck. Otherwise, a short pull by caterpillar may <br />be needed at these two places. No bulldozing will be needed, but a few rocks <br />at the north abutment will need to be pryed out of the way by crowbar. <br /> <br />f.~JS' <br />1;>.:':; <br />. ~:~.-'- ,~. <br />~j;r!~', <br />.'.:-'.:",- <br /> <br /> <br />~ <br /> <br />..~\.S:., <br />...;......: <br /> <br />G::~~;:;~ <br />;. ;:. :::~ ~ <br />}::~:.:}~ , <br /> <br />~!:,~!':[ <br /> <br />r....:........ <br /> <br /> <br /> <br /> <br /> <br />~h;>1 <br />.:~t~0:~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1'&'+1' <br /> <br />I, <br /> <br />/:..y.:i..~,: <br />::.ii\~;::,:' <br />;'\)::...;.: <br />.-;:- ;.... <br /> <br />...::://:.:.:. <br /> <br />...:,:':::."1- <br />:.... '.-:' <br />'.- ..:.'. <br />.';'....:....... <br />.:....,:.. <br />(:..::.;~~\:: <br />.:.; .;~:.:'. <br />. .:.' ~'.:.'.: <br /> <br />All of the drill holes will need to be water-pressure tested at least .....,...: <br /> <br />;;~;~r~~ i~:;e:fa~~t:~~;;ed~amPles and cores need to be pre~erved and ti:~~~ <br /> <br />..~.~:~.::........:.~.'...~.~~~.:.;..:.......:.-:::.,..,.. .. .,."..... f r.. .., .:~'.r.~'~:'~ .' : '":'2. J.::;"" .>:;.........:..: :~.~:f :~.- )~~::< '. ..:.;.. . :~::'.:~~~.;: ..~:<,<.:: .~...:' ::.: ':.;. .., :~:.......~..._._.-..-..r..:....:.-..~.~...::.~.....>.:.":.:.'._.:; . ..;-'. ..:.: ....~.. '_ ..' .:.:;:r..,......:.:..~:...~...,......:~:.........~.:....,.,.,................,:.. <br />.,:...\;:-;.~i;;;~:..,;~...~_\,?t.~~.!;j::;: ;>:'>; <: ;; :.. ....':..: >..., .... ... ".:.';j<' ,>. "0:;'.. . ... . .. >. <br />'.'~">.;:;"'.-:... ,. .- .....;.. ".'.,.~. ..'~. .:...',.. .'. ....:~.~...,-,":..::..:.--'..../ .:..-.?-~.~~;;...:~<::.;:-::::':~: <br />