Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />n-. 'I'" ~ <br />. t ~ u <br />v -'...,........ <br /> <br />2. <br /> <br />Bypass tor fishery purposes below yellow Jacket Diversion Dam - <br /> <br />30 c.t.s. min. non-irrigation season, 70 C.t.8. min. during irri- <br /> <br />aation seasOD. <br /> <br />3. Bumble Oil Co. S"eetbriar Res. 10,700 A.P. each year fram South Pork <br />White River. <br /> <br />4. Piceaoce pipeline tr_ So. Fork White River - 35 c.t.s. 7 lIOnths, <br /> <br />(Hon-Irrigation season) , 70 c.f.s. 5 months, (irrigatiOD season). <br /> <br />5. Historic diversion to senior ri8hte, White River. except ae notad: <br />A. Oak Ridge Park Ditch enlargement to 121 c.f.s.l divcrsione <br />increased 181'- but do not exceed 121 c.f.s. <br /> <br />6. Water rizhts of the Yell"", Jacket Project coneidered eenior to <br /> <br />Rocky Mountain P~~er Company, either by decree or by stipulation. <br /> <br />Case II - Power decree of 180 C.f.ll. at orf.ainal location. <br /> <br />1. Itl!lllll 1 through 6, Case I. the uae. <br /> <br />2. 180 c.f.s. Bt original location. <br /> <br />3. Return flaw from power plant avallable to 8upply rights below Meeker <br /> <br />Canal, return to river 11 considered to be below the Meaker Canal and <br /> <br />above the Niblack Ditch. <br /> <br />Case III - Power decres of 180 c.f.s. traneferred to Bighland Ditch. <br /> <br />1. Iteae 1 through 6, Caee I. the 88111e. <br /> <br />2. 180 c.f.8. transferred to Highland Ditch. <br /> <br />3. Return flow from power plant available to eupply rilhts below Meeker <br />canal. Return to river is considered to be below the Meeker Canal and <br /> <br />above the Riblock Ditch. <br /> <br />c <br /> <br />~. <br /> <br />-2- <br />