My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07060
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:33 PM
Creation date
10/12/2006 2:04:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449
Description
Platte River Projects
State
CO
Basin
South Platte
Date
6/1/1989
Author
CWRPDA
Title
Summary Report, Clear Creek Project, Phase 1, Step 2, Feasibility Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />TABLE OF CONTENTS (CONTINUED) <br /> <br />5.5 POTENTIAL PROJECT BENEFITS . . . . . . . . <br />5.6 RESULTS OF ECONOMIC AND FINANCIAL ANALYSIS <br />6.0 CONCLUSIONS AND RECOMMENDATIONS <br />6.1 CONCLUSIONS.. <br />6.2 RECOMMENDATIONS.. <br /> <br />Paoe <br />5-3 <br />5-5 <br />6-1 <br />6-1 <br />6-5 <br /> <br />Table <br />2.1 <br />2.2 <br />3.1 <br />3.2 <br /> <br />3.3 <br /> <br />4.1 <br />5.1 <br />5.2 <br />5.3 <br /> <br />Fioure <br />1.1 <br />1.2 <br /> <br />LIST OF TABLES <br /> <br />Step 2 Project Water Supply Scenarios . . . . . . . . <br /> <br />Maximum Firm Yield and Associated Reservoir Capacity <br /> <br />Highway Relocation Alternatives . . . . . . . . . . . <br /> <br />Estimated Construction Costs for Centennial Reservoir <br />Highway Relocations . . . . . . . . . . . . . . . . . <br /> <br />Projected Changes in Travel Time (in Minutes) for Traffic <br />Currently Using U.S. Highway 6 <br /> <br />Centennial Dam Cost Summary <br /> <br />Cost Summary . . . . . . . . <br /> <br />Firm Yield . . . . . . . . . <br /> <br />Project Costs, Representative Project Four <br />Water Supply Scenarios <br /> <br />Paoe <br />2-2 <br />2-2 <br />3-4 <br /> <br />3-4 <br /> <br />3-5 <br />4-3 <br />5-4 <br />5-4 <br /> <br />5-6 <br /> <br />LIST OF FIGURES <br /> <br />2.1 <br />3.1 <br />4.1 <br />4.2 <br />4.3 <br /> <br />Project Area Map . . . . . . . . . . . . . . . . . . . . . . . . <br />Clear Creek Project Development: Key Steps and <br />Representative Schedule . . .. ...... <br />Firm Yield vs. Total Storage . . . . . . <br />Highway Data Along Corridors in the Project Area <br />Centennial Dam Typical Plan, Profile & Section <br />Dam Height vs. Construction Cost For Centennial Dam <br />Reservoir Volume vs. Construction Cost For Centennial <br />Dam <br />Unit Costs of Water . . . . . . <br /> <br />Paoe <br />1-6 <br /> <br />1-7 <br />2-4 <br />3-7 <br />4-5 <br />4-6 <br /> <br />5.1 <br /> <br />4-7 <br />5-7 <br /> <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.