Laserfiche WebLink
<br />, <br /> <br />.'.;--., <br />, <br /> <br />. .:)~ <br /> <br />,. <br /> <br />I\Q~;..,.,n <br />"",,', tl <br />J ......).... <br /> <br />- 2 - <br /> <br />" <br /> <br />Le ngt h <br />Capacity <br />Diameter <br />Fourmile Creek Siphon (concrete) <br />Length <br />Capacity <br />Diameter <br />Minor structures <br />7 concrete siphons <br />2 concrete wasteways <br />2 concrete flumes <br />1 diversion dam (Willow Creek) <br />turnouts, culverts. cross flumes. bridges <br />and drainage inlets would be provided as <br />required, <br /> <br />Dolan Mesa Canal <br /> <br />W-, <br /> <br />Total length <br />Initial capacity <br />Earth lining <br />Concrete bench flume <br />Major structures <br />Dolan Mesa Diversion Dam (concrete <br />structure designed to pass 2,600 second-feet) <br />Minor structures <br />5 concrete siphons <br />2 flumes <br />2 concrete wasteways <br />2 concrete chutes <br />turnouts. culverts, bridges, and drainage <br />inlets would be provided as required. <br /> <br />Westside Canal Extension <br /> <br />Total length <br />Init ial capacity <br />Earth lining <br />Structures <br />1 concrete chute <br />5 concrete siphons <br />1 metal flume (existing) <br />1 diversion structure (Fourmile Creek) <br />Turnouts, culverts, bridges and drainage <br />inlets would be provided as required. <br /> <br />Drains <br /> <br />3 drains would be constructed <br />Total length <br />Bridges, Culverts and drainage <br />inlets would be provided as required. <br /> <br />Laterals <br /> <br />. ',~ <br /> <br />" <br /> <br />0.34 mi les <br />235 seoond feet <br />7 feet <br />1. 22 miles <br />235 second feet <br />6 feet <br /> <br />19.2 <br />60 <br />2.3 <br />400 <br /> <br />miles <br />second-feet <br />miles <br />feet <br /> <br />15 ,7 miles <br />40 second-feet <br />3.0 miles <br /> <br />5.3 miles <br /> <br />Laterals from main canal would be constructed as needed <br />to serve new project lands. <br />