Laserfiche WebLink
<br />',' . <br />';{ ". <br />I ,}~,~ :~~",~~."-,, <br /> <br />~ <br /> <br />~, <br /> <br />.-' <br /> <br />n \': ... ~ ,.., I <br />t: .J ,I :, ,~ 'l! <br /> <br />',' <br /> <br />Minor structures <br />5 concrete siphons <br />2 flumes <br />2 ccncrete wasteways <br />2 concrete chutes <br />turnouts, culverts, bridges, and drainage <br />inlets would be provided as required. <br /> <br /><:~:>.;<::~ <br /> <br />..... <br /> <br /> <br />Westside Canal Extension <br /> <br />" <br /> <br />Total length <br />Irrltial capacity <br />Earth lining <br />Structures <br />1 concrete chute <br />5 concrete SlpnOns <br />1 metal flume (existing) <br />1 diversion structure (Fourmile Creek) <br />Turnouts, culverts, bridges and drainage <br />inlets would be provided as required, <br /> <br />15.7 niiles <br />40 second-feet <br />3.0 miles' <br /> <br />" "'I <br />" <br />....... <br />.,., <br />. -:::_~;. <br /> <br />::;.(. .... <br /> <br />.;. .;'.' <br /> <br />,'.: <br /> <br />:.: ">:.~ <br />.:'; <br />, , <br /> <br />Dr~ins <br /> <br /> <br />3 drains would be constructed <br />Total length <br />Bridges, culverts and drainage <br />inlets would be provided as required. <br /> <br />5.3 miles <br /> <br />.;.,... <br /> <br />Laterals <br /> <br />." ":;":: <br /> <br />.:.:-: <br /> <br />Laterals from main canals Hould be constructed as needed <br />to serve new project landso <br /> <br />......:;....: I <br />.....,.; <br /> <br />.-::f.::.".. <br />.\' ;~:' <br /> <br />.";.'.-f.; <br /> <br />Cost Estimates <br /> <br />~r.. :._:.'.:~;~:,' <br />" 4'. <br /> <br />Feature Construction Cost Annual cost y <br />Pot Hook Reservoir $3,856,000 $5,500 <br />Savery Reservoir 2,062,000 3,800 <br />Pot :jook Canal 4,758,000 37,900 <br />Dolan Mesa Canal 864,000 7,500 <br />Westside Extension 279,000 3,800 <br />Drains 104,000 1,100 <br />Laterals 3/ 6,000 <br />Total $11,923,000 $65,600 <br /> <br />,fl~j;:~; <br /> <br />...... <br /> <br />',' <br /> <br />Y Annual operation, maintenance and replacement, <br /> <br />g/ Construction cost of laterals included in totals for main canals. <br /> <br />. '.- .' <br /> <br />3 <br /> <br /> <br />" <br /> <br />, " <br /> <br />::: <br />