<br />Minor structures
<br />5 concrete siphons
<br />2 flumes
<br />2 ccncrete wasteways
<br />2 concrete chutes
<br />turnouts, culverts, bridges, and drainage
<br />inlets would be provided as required.
<br />
<br /><:~:>.;<::~
<br />
<br />.....
<br />
<br />
<br />Westside Canal Extension
<br />
<br />"
<br />
<br />Total length
<br />Irrltial capacity
<br />Earth lining
<br />Structures
<br />1 concrete chute
<br />5 concrete SlpnOns
<br />1 metal flume (existing)
<br />1 diversion structure (Fourmile Creek)
<br />Turnouts, culverts, bridges and drainage
<br />inlets would be provided as required,
<br />
<br />15.7 niiles
<br />40 second-feet
<br />3.0 miles'
<br />
<br />" "'I
<br />"
<br />.......
<br />.,.,
<br />. -:::_~;.
<br />
<br />::;.(. ....
<br />
<br />.;. .;'.'
<br />
<br />,'.:
<br />
<br />:.: ">:.~
<br />.:';
<br />, ,
<br />
<br />Dr~ins
<br />
<br />
<br />3 drains would be constructed
<br />Total length
<br />Bridges, culverts and drainage
<br />inlets would be provided as required.
<br />
<br />5.3 miles
<br />
<br />.;.,...
<br />
<br />Laterals
<br />
<br />." ":;"::
<br />
<br />.:.:-:
<br />
<br />Laterals from main canals Hould be constructed as needed
<br />to serve new project landso
<br />
<br />......:;....: I
<br />.....,.;
<br />
<br />.-::f.::."..
<br />.\' ;~:'
<br />
<br />.";.'.-f.;
<br />
<br />Cost Estimates
<br />
<br />~r.. :._:.'.:~;~:,'
<br />" 4'.
<br />
<br />Feature Construction Cost Annual cost y
<br />Pot Hook Reservoir $3,856,000 $5,500
<br />Savery Reservoir 2,062,000 3,800
<br />Pot :jook Canal 4,758,000 37,900
<br />Dolan Mesa Canal 864,000 7,500
<br />Westside Extension 279,000 3,800
<br />Drains 104,000 1,100
<br />Laterals 3/ 6,000
<br />Total $11,923,000 $65,600
<br />
<br />,fl~j;:~;
<br />
<br />......
<br />
<br />','
<br />
<br />Y Annual operation, maintenance and replacement,
<br />
<br />g/ Construction cost of laterals included in totals for main canals.