Laserfiche WebLink
<br />~-,,{ <br />~:,I <br />" <br /> <br />I ~,. <br />~.~ <br /> <br />1 <br />I <br />I <br />I <br /> <br />0) <br />('y...; <br />~ <br /> <br />(-..; <br />',..- ) <br /> <br />RULES AND REGULATIONS <br /> <br />", <br />'-- <br /> <br />(b) Excess releases from Elephant Butte Reservoir, as <br />defined in (a) above, shall be added to the quantity of <br />water actually in storage in that reservoir, and Actual <br />Spill shall be deemed to have commenced when this sum <br />equals the total physical capacity of that reservoir, to <br />the level of the uncontrolled spillway, i.e.-2,219,000 acre- <br />ft in 1942. <br /> <br />(c) All water actually spilled at Elephant Butte <br />Reservoir, or released therefrom, in excess of Project <br />requirements, which is currently passed through Cabal10 <br />Reservoir, after the time of spill, shall be considered as <br />Actual Spill, provided that the total quantity of water <br />then in storage in Elephant Butte Reservoir exceeds the <br />physical capacity of that reservoir at the level of the sill <br />of the spillway gates, i.e.-l,830,000 acre-ftin 1942. <br /> <br />(d) Water released from Caba110 Reservoir in excess <br />of Project requirements and in excess of water currently <br />released from Elephant Butte Reservoir, shall be deemed <br />Usable Water released, excepting only flood water entering <br />Cabal10 Reservoir from tributaries below Elephant Butte <br />Reservoir. <br /> <br />DEP ARTURES FROM NORMAL RELEASES Q <br /> <br />For the purpose of computing the time of Hypothetical <br />Spill required by Article VI and for the purpose of the <br />adjustment set forth in Article VII, no allowance shall <br />be made for the difference between Actual and Hypothetical <br />Evaporation, and any under-release of usable water from <br />Project Storage in excess of 150,000 acre-ft in any year <br />shall be taken as equal to that amount. <br /> <br />EVAPORATION LOSSES ii, !.2., L2. <br /> <br />The Commission shall encourage the equipping, main- <br />tenance and operation, in cooperation with the U.S. Weather <br />Bureau or other appropriate agency, of evaporation stations <br />at Elephant Butte Reservoir and at or near each major <br />reservoir in the Rio Grande Basin within Colorado construc- <br />ted after 1937 and in New Mexico constructed after 1929. <br />The net loss by evaporation from a reservoir surface shall <br />be taken as the difference between the actual evaporation <br />loss and the evapo-transpiration losses which would have <br />occurred naturally, prior to the construction of such <br />reservoir. Changes in evapo-transpiration lasses along <br />stream channels below reservoirs may be disregarded. <br /> <br />3 Adopte <br />4 Amended <br />5 Amended <br />6 Amended <br /> <br />June 2, 1959; made effective January 1, 1952. <br />at Tenth Annual Meeting, February 15, 1949. <br />at Twelfth Annual Meeting, February 24, 1951. <br />June 2, 1959. <br /> <br /> <br />~ . ~ '. -. ".., . <br /> <br />21 <br /> <br />-';;'.'ii." <br /> <br />"'Jiif~<,.~~ <br />i,:1,;'!i;,W .- ~(;t <br />~r~~:... , <br />~:Te~:;'~\,,~:, . <br />:;~lItr~>,. . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />, ,,', ",-. ~ <br />~::i.r:, :':_~_;:~\?~:- ;<:::.:; :" . <br /> <br />. .I.~-~" <br /> <br />-.- <br />