My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07034
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:27 PM
Creation date
10/12/2006 2:03:51 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
8/21/1992
Author
Unknown
Title
Paonia Project-Fire Mountain Canal Fact Sheet - Gunnison River Basin Planning Model
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />- Assumed Period <br />of Operation: <br /> <br />April-Oct (CDWR/SEO ) <br /> <br />50 cfs (19415.17059) <br />44.5 cfs (21701.00000) <br />7.5 cfs (25807.21731) <br />106.0 cfs (31924.31197) <br />(See Attachment C) <br /> <br />(CDWR/SEO) <br /> <br />C~ <br />Q <br />1-" <br />r'" <br />01 <br />c:r.I <br /> <br />- Direct flow water <br />rights: <br /> <br />- Acreages irrigated <br />above and below Leroux <br />Creek: <br /> <br />See Attachment E <br /> <br />Other delivery systems used by Paonia project (if any): <br /> <br />-- Irrigation of lands above paonia Reservoir by exchange with Ragged Mountain <br />Water Users Association: <br />- copy of water service contract with USBR provided in Attachment F <br />- listing of ditches serving exchange lands to be provided by CDWR/SEO <br /> <br />Irrigation of lands in Leroux Ck. Division by exchange for supplies <br />from the Fire Mountain Canal: <br />- A principal feature of the Paonia Project is the provision for the <br />diversion of decreed waters of the Leroux Ck. watershed upstream from the <br />pointof crossing of Leroux Ck. by the Fire Mountain Canal and the replacement <br />of supplies previously delivered below the canal with project supplies from <br />the North Fork mainstem and paonia Reservoir storage. The project Definite <br />Plan Report indicates 4510 acres of supplemental service land and 690 acres <br />of full service land served by the paonia Project within the Leroux Ck. <br />division, all of which are served by exchange. . <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.