Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />- Assumed Period <br />of Operation: <br /> <br />April-Oct (CDWR/SEO ) <br /> <br />50 cfs (19415.17059) <br />44.5 cfs (21701.00000) <br />7.5 cfs (25807.21731) <br />106.0 cfs (31924.31197) <br />(See Attachment C) <br /> <br />(CDWR/SEO) <br /> <br />C~ <br />Q <br />1-" <br />r'" <br />01 <br />c:r.I <br /> <br />- Direct flow water <br />rights: <br /> <br />- Acreages irrigated <br />above and below Leroux <br />Creek: <br /> <br />See Attachment E <br /> <br />Other delivery systems used by Paonia project (if any): <br /> <br />-- Irrigation of lands above paonia Reservoir by exchange with Ragged Mountain <br />Water Users Association: <br />- copy of water service contract with USBR provided in Attachment F <br />- listing of ditches serving exchange lands to be provided by CDWR/SEO <br /> <br />Irrigation of lands in Leroux Ck. Division by exchange for supplies <br />from the Fire Mountain Canal: <br />- A principal feature of the Paonia Project is the provision for the <br />diversion of decreed waters of the Leroux Ck. watershed upstream from the <br />pointof crossing of Leroux Ck. by the Fire Mountain Canal and the replacement <br />of supplies previously delivered below the canal with project supplies from <br />the North Fork mainstem and paonia Reservoir storage. The project Definite <br />Plan Report indicates 4510 acres of supplemental service land and 690 acres <br />of full service land served by the paonia Project within the Leroux Ck. <br />division, all of which are served by exchange. . <br /> <br />3 <br />