My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07020
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:23 PM
Creation date
10/12/2006 2:03:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1982
Author
CRBSCF
Title
Fifth Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - December 1982
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Status of Salinity Control Activities <br /> <br />Bureau of Reclamation <br /> <br />o <br />w <br />c.o <br />to <br /> <br />Construction of the salinity projects authorized by <br />Title II of P.L. 93-320 or their equivalents is necessary to <br /> <br />maintain salinity in the lower mainstem of the Colorado River <br /> <br />at or below the 1972 levels while the Basin states continue <br /> <br />to develop their compact-apportioned waters. <br /> <br /> <br />Paradox Valley Unit - The brine inflow control program <br /> <br /> <br />as proposed has been tested and verified. The brine disposal <br /> <br />plan using deep well injection has been evaluated and is <br /> <br />considered the most cost-effective disposal alternative. On <br /> <br />August 3, a notice of award and notice to proceed with work <br /> <br />on additional collection wells and brine pipeline extensions <br /> <br />were issued to Nielsons, Inc., of Cortez, Colorado. Work is <br /> <br />scheduled to be completed by January 3, 1983. Also in the <br /> <br />process is the awarding of contracts to oversee the deep well <br /> <br />injection. <br /> <br />Specifications for constructing and testing the <br /> <br />injection wells are presently being prepared, and a contract <br /> <br />will be awarded in June 1983. The project as being planned <br /> <br />will cause no significant environmental impact. <br /> <br />Construction funding for the Paradox Valley Unit for FY <br />1982 is $2,286,996. The President's budget request for Fis- <br />cal Year 1983 funding is $6,401,000. <br /> <br />Q!:.!!!.L.Y.!H~L.Y.!!l.l.1._2l!Ei~_1 - The 11 n i n g 0 f the <br />Government Highline Canal is basically complete. Only minor <br /> <br />-8- <br /> <br />ij;-':;>.;j~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.