My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07016
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:22 PM
Creation date
10/12/2006 2:03:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.800
Description
Dirty Devil Unit - Colorado River Salinity Control Program
State
UT
Basin
Colorado Mainstem
Date
5/1/1987
Title
Planning Report and Finding of No Significant Impact (FONSI)
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY (Continued) <br /> <br />. <br /> <br />. <br /> <br />Summary Table 3 <br />Cost allocation and repayment <br />Item <br />Capital costs to be allocate~1 <br />Unit features <br />Engineering and overhead <br />Advance planning <br />General investigation <br />Subtotal <br />Interest during constructio~/ <br />Subtotal <br />Less investigation costs <br />Total <br />Nonreimbursable (70 percent) <br />Reimbursable (30 percent) <br />Repayment of reimbursable capital costs <br />Lower Colorado River Basin Development Fun~/ <br />(85 percent) <br />Upper Colorado River Basin Fund (15 percent) <br />Annual payments require~/ <br />Annual operation, maintenance, and replacement costs2/ <br />Nonreimbursable costs (70 percent)~/ <br />Reimbursable costs (30 percent) <br />Repayment of reimbursable operation, maintenance, <br />and replacement costs <br />Lower Colorado River Basin Development Fund (85 percent) <br />U er Colorado River Basin Fund (15 ercent) <br />1 Including reimbursable interest during construction <br /> <br />Amount <br /> <br />$8,120,000 <br />2,680,000 <br />950,000 <br />3,200,000 <br />14,950,000 <br />2,336,000 <br />17,286,000 <br />-3,200,000 <br />14,086,000 <br />9,860,000 <br />4,226,000 <br /> <br />2,996,000 <br />634,000 <br />79,000 <br />583,000 <br />408,000 <br />175,000 <br /> <br />149,000 <br />26 000 <br />at 12.375 <br /> <br />percent <br />2/ Interest during construction computed at 8.625 percent <br />($1,596,000) is reimbursable at 12.375 percent pursuant to Public Law <br />98-569 and totals $2,336,000. <br />3/ Reduced by $596,000 interest during construction which assumes <br />the Lower Basin States will pay their construction costs as facilities <br />are constructed. <br />4/ Based on 50 years with interest at 12.375 percent. <br />5/ While the current economic value of power is used for plan for- <br />mulation purposes, the unit would use CRSP power in actual operation. <br />Therefore, CRSP power costs are used for cost allocation and repayment <br />purposes. <br />~/ Amount to be appropriated each year from Congress. <br /> <br />. <br /> <br />S-14 <br /> <br />002322 <br />
The URL can be used to link to this page
Your browser does not support the video tag.