Laserfiche WebLink
<br />~. <br /> <br />Project costs for the Desalting Complex Unit are summarized in Table 1. <br />The investment cost$ shown include interest during construction, where <br />applicable, and the operation and maintenance costs shown are for full <br />desalting plant production capacity and full nonstructural program opera- <br />tion. The cost of electric power is an annual equivalent cost based on a <br />supply frOm the Navajo PrOject. <br /> <br />18 <br />