My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06918
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:55 PM
Creation date
10/12/2006 1:58:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
UCRBRIP Habitat Restoration
Basin
Colorado Mainstem
Date
10/8/1997
Author
UCRBRIP
Title
Final Habitat Restoration Program FY 1998 Work Plan Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~w <br /> <br />2. Place sediment traps at strategic locations within the backwater to determine sediment deposition <br />rates at varying flows and times of the year. Compare to baseline information, <br />3, Take sediment core samples and analyze layers for selenium (and other inorganics) to determine <br />if flows are successfully diluting sediment selenium concentrations. <br />4, Sample food organisms and analyze for selenium (and other inorganics) to determine if changes, <br />ifany, taking place. Zooplankton, benthic invertebrates and small fish (up to 250 mm) will be <br />collected. <br />5. Sample water and analyze for selenium (and other inorganics) to determine changes, ifany, <br />taking place. Measure water quality parameters monthly. <br />6. Collect muscle plugs from Colorado squawfish using the channel area and analyze for selenium <br />residues. <br />7. Analyze data and prepare draft and final reproductive reports. (This report will include Adobe <br />Creek data also.) <br /> <br />Objective 2: <br />I. Analyze data and prepare draft and final reports for the remediation study for the Walter Walker <br />site. <br /> <br />FY 98 Work <br />Objective 1: <br /> <br />According to Steve Hamilton (2/18/98), a draft report on the 1995/96 razorback sucker reproduction <br />study will be out for review in April 1998; a draft report on the pre-water-control structure channel <br />(remediation) study in summer 1998; a draft report on the 1996/97 razorback reproduction study in fall <br />1998; a draft report on the post-water-control structure channel (remediation) study in March 1999. <br /> <br />USGS <br />Labor <br />Sample analysis <br />MSC overhead <br />Total <br /> <br />$3 I ,000 <br />$42,000 <br />$ 7000 <br />$80,000 <br /> <br />FWS <br />Labor <br />Overhead <br />Total <br /> <br />$15,000 <br />$ 1.667 <br />$16,667 <br /> <br />USBR <br />Labor <br />Total <br /> <br />$60.000 <br />$60,000 <br /> <br />Total FY 98 <br /> <br />$156,667 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.