Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />1",,-:;" .-"- ,'" <br />.),.) t." <br /> <br />BASALT PROJECT <br /> <br />Estimated <br />construction cost <br />17$1.885.000 <br /> <br /> <br />PROJECT PLAN. FEATURES, AND COSTS <br /> <br />by project features includes contingencies, engineering, and general <br />expenses. <br /> <br />Feature <br />Ruedi Reservoir <br />Missouri Heights Reservoir <br />enlargement <br />Basalt Conduit <br />Landis Canal <br />Carbondale Canal <br />Sopris Canal <br />Spring Valley lateral <br />Farm laterals <br />Drains <br />Total <br />1/ Portion of reimbursable cost <br />to Basalt project. <br /> <br />2,050,000 <br />9,290,000 <br />570.000 <br />280,000 <br />265,000 <br />1,280,000 <br />1.415.000 <br />510,000 <br />17.545.000 <br />assignable <br /> <br />Operation, maintenance, and replacement costs <br /> <br />Operation, maintenance, and repla.cement costs are estimated at <br />$49,000 annuallY. based on average wages and prices from 1959 through <br />1961. Included in this amount is $2,100 assigned to the Basalt project <br />for operation and maintenance of the Ruedi Dam and Reservoir. The esti- <br />mate includes the cost of personnel, equipment, materials. supplies, and <br />administrati ve services. It does not include operation and maintenance <br />costs of existing irrigation facilities. <br /> <br />1'( <br />