Laserfiche WebLink
<br />.." _,n', ~." _~' 1 <br />~ V tli~: <br /> <br />. <br /> <br />;;/BALT PROJECT <br /> <br />PROJECT PLAt'f. FEATURES. ilND COSTS <br /> <br />The lower 12 miles of the COllduit would involve earth excavation <br />through nonirrigated pasture lend vhere the vegetative cover consists of <br />scrub oak and brush. Clearing requirements and canal lining requirements <br />would both be light. <br /> <br />Landis Canal <br /> <br />The Landis Canal consistinG almost entirely of open eal~h section <br />would head at the outlet of Missouri Heights Reservoir and would extend <br />northvest approximately 22.8 miles to its terminus at the head of the <br />Spring Valley lateral system. <br /> <br />The .ce.nal capacity would be 220 second-feet for the first 7.5 miles <br />above the Cattle Creek outlet, 140 Second-feet for the nel<"t 13.1 miles <br />above the Landis Creek outlet, and 50 second-feet for the remaining 2.2 <br />miles which includes an 0.8-mile-long siphon across Landis Creek. <br /> <br />. <br /> <br />Excavation would be mostly in reddish sand clay loam soils vith some <br />Imra cobbles, boulders, and broken sandstone. Gravelly soils would be <br />encountered near strear1 channels but there appears to be sufficient fine <br />material along the canal route to assure satisfactory construction condi- <br />tions. Cross slopes average about 20 percent. Turnouts, wasteways, drop <br />structures, measuring devices, bridges, and culverts would be provided as <br />lleeded along the canal route. <br /> <br />Spring Valley lateral <br /> <br />The Spring Valley lateral would head at the outlet 01' the Landis <br />siphon of the Landis Canal and extend southwest about 2.8 miles, convey- <br />ing irriga.tion water to lands on the Spring Valley Bench. The lateral <br />would consist of open canal section and would have a capacity of 50 second- <br />feet. No special construction prOblems are anticipated. <br /> <br />Carbondale Canal <br /> <br />The Carbondale Canal would head on a natural channel approximately <br />one mile below the outlet of the Missouri Heights Reservoir. It would <br />meander southwest a total distance of 12.6 miles, terminating at Thomas <br />Creek about 5 miles southeast of Carbondale. The canal would convey <br />project vater to lands in the Carbondale erea. About midway along its <br />course the canal would cross the Roaring Fork River by meHns of a siphon <br />6,800 feet long. ~'he Sopris Canal would branch from the Carbondale Canal <br />at the outlet of the siphot:!. <br /> <br />. <br /> <br />The Cffilal would have a capacity of 55 second-feet from its head to <br />the outlet of the Roaring Fork siphon and 30 second-feet beyond that <br />point. It would consist of about 10.lt miles of open earth section and <br />2.2 miles of concrete section. Clearing would be light and most of the <br /> <br />15 <br /> <br />