My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06916
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:54 PM
Creation date
10/12/2006 1:58:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Date
12/1/1962
Author
US DoI BoR
Title
Ruedi-Western Slope Investigations Colorado Reconnaisance Reports on Basalt and Bluestone Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5,500 <br />14,200 <br /> <br /> <br />. <br /> <br />" ...... .~ I.' ,,<, <br />'.,'. f.- .' <br />....~-.j ~ \,,:; <br /> <br />INTRODUCTION <br /> <br />In the initial feasibility report on the Fryingpan-Arkansas project. <br />prepared by the Bureau of Reclamation and printed as House Document No. <br />187. 83rd Congress. a 28.000-acre-foot capacity reservoir at the Aspen <br />site on Roaring Fork was proposed to provide replacement storage for the <br />western slope. As a result of extensive studies of alternative sites and <br />conferences among all interests in Colorado and concerned Federal agen- <br />cies. the plan was chmlged to include the larger Ruedi Reservoir instead <br />of the Aspen Reservoir. A supplemental report by the Bureau of Reclama- <br />tion on the Ruedi Dam and Reservoir was printed as House Document No. <br />353, 86th Congress, 2d Session. The preliminary cost estimate for the <br />dam and reservoir shown in the supplemental report. based on January 1959 <br />prices, is $12.831.000. <br /> <br />. <br /> <br />The cost of the originally proposed Aspen Dam ana Reservoir was <br />estimated at $7.600.000. The Fr.ringpan-Arkansas project wss analyzed and <br />justified on the basis of this cost for replacement storage. Since the <br />Ruedi Reservoir will perform the same replacement function, that amount <br />was assigned in the supplemental report as a Fryingpan-Arkansas project <br />cost, leaving $5.231,000 of the cost of Ruedi Dam and Reservoir to be <br />allocated among future project purposes on the western slope. Interest <br />during construction was estimated in the report at $664,000 and annual <br />operation and maintenance costs were estimated at $19.700. including <br />$10.500 for recreational facilities. <br /> <br />The operating principles previously mentioned provide that operation <br />and maintehance costs of Ruedi Reservoir. shall be borne by eastern mld <br />western slope water users in such proportions as may be determined by the <br />Secretary of the Interior. Assuming that the Secretary determines that <br />operation and maintenance costs and costs of interest during construction <br />shall be distributed in the same proportions as construction costs as <br />outlined above, the assignment of all costs and amounts reimbursable <br />would be as shown in the following tabulation. <br /> <br />7,600,000 <br />5,231.000 <br /> <br />Interest <br />during <br />construc- <br />tion <br />$664.000 <br /> <br />398,400 <br />) 6 <br />2b5, 00 <br /> <br />Annual <br />operation <br />and <br />maintenPillce <br />$19.700 <br /> <br />. <br /> <br />Item <br />Total. Ruedi nam-and Reservoir <br />Assigned to Fryingpan-Arkansas <br />project <br />Remaining western slope costs <br />Less nonreimbursable costs2J <br />Flood control 117.500 6,000 100 <br />Fish and wildlife 1;757.800 90,200 1,300 <br />Recreation 55,000 10,500 <br />Subtotal .....l.J!30 ,300 96 .200 .Jl ,900 <br />Reimbursable cost 3,300.700 169.400 2.300 <br />1/ The.tentative allocation of nonreimbursable construction costs <br />to project purposes taken from supplemental report on Ruedi Dam and <br />ReserVOir, H. D. 353. 86th Congress. 2d Session. <br /> <br />Construction <br />cost <br />$12,831.000 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.