Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />AF OMIO Irriaation SupplY. Includes water for <br />hydraulic pumps, Vinelands diversion, and <br />irrigation supply to distribution canals. <br />Supply is 100% of demand [Col. I+J+K] except <br />for Condition '6, when OMIO receives 35% of <br />available surplus over GVIC demand. <br />[0.35 x (O-F)]. <br /> <br />AG OMIO Irriaation Shortaae. [Col. I+J+K-AF]. <br /> <br />AH <br /> <br />~ llQ cfs Junior Riaht Supply. <br />100% under Condition ill [Col. G], <br />under Condition 112 [Col. O-M]. <br />other conditions, supply is zero. <br /> <br />Supply is <br />but short <br />Under all <br /> <br />AI GVIC ll.Q. cfs Junior Riaht Shortaae. <br />[Col. G-AH]. <br /> <br />AJ Total Combined Irriaation System Shortaae. <br />Shortage to all major diversions serving the <br />Grand Valley area. [Col. AC+AE+AG+AI]. <br /> <br />AK OMIO PSCo Power Plant Supply. Supply is <br />100% [Col. L] under Condition 111, 112, /13, <br />and 114. Under Condition 115, power plant is <br />allowed the difference between total <br />Colorado River supply and the combined OMIO <br />and GV PROJ irrigation diversions. This <br />assumes the Roller Dam is closed and the <br />check is fully utilized [Col. O-(AO+AF)]. <br />Under Condition #6, the check is supplying <br />100% of the GVIC Colorado River demand, and <br />anything over the amount needed for the OMIO <br />hydraulic pumps is routed through the power <br />plant [Col. AB-272 cfs]. <br /> <br />AL OMIO PSCo Power Plant Shortaae. <br /> [Col. L-AK]. <br />AM Flow in Orchard Mesa Check. <br /> Condition ill [0] Not operating <br /> Condition #2 [0] Not operating <br /> Condition #3 [E-(B-M)] Optimize Power <br /> Production <br /> Condition #4 [AB] Power & Senior <br /> Call <br /> Condition /15 [AB] Power & Senior <br /> Call <br /> Condition /16 [AB] Power & Senior <br /> Call <br />