Laserfiche WebLink
<br />COI.ORADO RIVER STORAGE PRO'f:cr <br /> <br />transmission system <br /> <br />12 <br /> <br /> <br />UTAH <br /> <br />GIM Canyon <br />r'; <br /> <br />fA09Sfo" <br /> <br />f <br /> <br />Annocle Peak <br /> <br />[Meso <br /> <br />t/Zf <br /> <br />. Fon/en"lI. <br /> <br />WYOMING <br />Flo,",fl9 Gor9' <br /> <br />L~'n' <br /> <br />f> COLOflADO <br />r AJ:HOYd'fl <br />r ~ I"RiII' ~re'fl M/ft. <br />V.mal Ron9f1. e,u, MIlO <br />M"c~:::rt';' rc,:,,",~,~"fSoI~' <br /> <br />~MJdwgy <br /> <br /> <br />Shiproclf <br /> <br />Nf-;W MfXICO <br /> <br />LEGEND <br />1; C RSP O"ivlfY Poinl <br />.; C R$P Hydro Plonl <br /> <br />Troflsmission Linu <br /> <br />power income <br />ncome from the sale~n!!e~~Jn~S <br /> <br />iscal Year1972 was $31 ,630,1-18, an In- <br />crease of $3.195.343 ovcr that for Fiscal <br />Year 1971. l>:vf1n though the runoff for <br />the 1971-72 water yellr wa.. about 70 <br />percent of normal. generation at CillO <br />Canyon Powerplant increased over the <br />previous year, primarily btlClluse of the <br />necessity to release sufficitmt water to <br />the lower Colorado River Basin to sat- <br />isfy the 10th year requirement of the <br />Colorado River Compact. Increases in <br />generation at Flaming Gorge. Morrow <br />Point. and Fontenelle Powerplants, and <br />decreases at Blue Mesa were associated <br />with local variations in runoff. custom- <br />er load rcquirellu!Ots, and the availa- <br />bilHyof Morrow Point generators forthe <br />full year. <br /> <br />ThlJ Colorado Rivcr Storage Project <br />transmission system includes 1.812 cir- <br />cuit mih~s of high voltage transmission <br />lines and 16 subslI'Ilions and switch- <br />yards with a total capacity of about <br />4,000,000 KVA. <br />