My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06896
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:50 PM
Creation date
10/12/2006 1:57:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
4/30/1979
Author
USACOE
Title
Transcript of the Formal Presentation at the Public Hearings for Re-evaluation of A Flood Control Operation Plan for Hoover Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br />r-- <br />~ <br />e' <br /> <br />" <br />~ <br />. <br /> <br />-' <br /> <br />; ~ 'I <br /> , <br /> I, <br /> 'I <br /> :' <br />:, <br />" <br /> ,: <br /> <br /> ~ I I <br /> i j <br /> I.' <br />~ <br />,- I <br /> ~ ,J <br /> ", <br /> <br />. . <br /> <br />23 <br />(35,000 ota) s~ep8. they were .elected beoause they are the <br /> <br />maximum power plant oapaaities ot Parker and Hoover Dams. <br /> <br />This li.t of nine (g) alternaUve. and any other <br /> <br />alterna~ive8 which may be ottered tor consideraUon, will be <br /> <br />evaluated uaing a variety of criteria. <br /> <br />One major 80urC. of evaluatlnq criteria will co.e tr <br /> <br />tile Hater llesource Council-. 80-called prinoiple. aneS <br /> <br />, <br /> <br />standards. These quidelin.. require that we eVAluate all <br /> <br /> <br />alternatives for thoir eftects on national ecenomic eSevelopae t, <br /> <br /> <br />environmental quality, r.qlonal development and .ocial <br /> <br /> <br />wcll-bein<J. <br /> <br /> <br />The Water Resource Council'. list ot criteria i. a vety <br />, <br /> <br />compre~ensi ve test which will insure thAt all of lIoover'. <br /> <br />purpoue., flood control, water oonservation, and power <br /> <br />production, are taken into full conaideration in the s.lectio <br /> <br />of any flood control operation plan. <br /> <br />,I <br /> <br />In analyzin9 the alternative. tor their oontribution <br /> <br />to national economic development we will consider .uch thing. <br /> <br />as benefits from reduotion in flood damage8, increa.ed water <br /> <br />:_'; conservlltion and hydropower qeneration, and improved watel' <br /> <br />. <br /> <br />,,-, <br /> <br />quality. <br /> <br />Environmental quality impacts could include change. <br /> <br />in water quality, partioularly with re9ard to salin1ty, and <br /> <br />~pact8 on wildlite end their habitat due to chanq.. 1n flood <br /> <br />frocquency. <br /> <br />c <br />
The URL can be used to link to this page
Your browser does not support the video tag.