My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06896
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:50 PM
Creation date
10/12/2006 1:57:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
4/30/1979
Author
USACOE
Title
Transcript of the Formal Presentation at the Public Hearings for Re-evaluation of A Flood Control Operation Plan for Hoover Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(.C> <br />c.o <br />I:'- <br />C".J <br /> <br />. <br /> <br />. <br /> <br />c: <br /> <br />.--- ---'-~----'~-'----l <br />131 <br />percent (9G') chance thAt ~he reservoirs of the Colorado I <br />River system will reach January 1 flood control level. withini <br />I <br />I <br />I <br /> <br />. <br /> <br />'-' <br /> <br />the next six (6) years. <br /> <br />Right. here, wh.re U79, the <br /> <br />prObability of a flood .vent 1n this yeA% 1. practically <br /> <br />zero. lwwever, if we do g.t this 11.7 million aor..f..t <br /> <br />runoff this year, t.hat'. April through July, we then have <br /> <br />about a fifty.six percent (56') of a flood ev.nt or having <br /> <br />to us. our flood control operation in 1980. But W.'re <br /> <br />looking ahead several year. and wh.n we get out int.o this <br /> <br />area and this vill be the time th. CAP'. coming on the line, <br /> <br />. <br /> <br />1905, 1986, or 1987, the probability of reaohing a flood <br />I <br />control level is there is about ninety.five (95'), nin.tY-.i~ <br />I <br /> <br />- <br /> <br />I <br />i <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />iloover Dam well in exce.s of flowa that have occurred in the I <br />, <br />I <br />I <br />In 1977 ve joined w1th the Corp. of Enqin..ra to I <br />I <br />begin A study of the situation with an 8i. toward 8 possible I <br />I <br />reviQlon of the flood control operation plan for ,Hoover Da. i <br />I <br />I <br />I <br /> <br />percent. (96t). <br /> <br />However, periodic high inflow y.ar. Uk. <br /> <br />1962, 1965, and 1973 can rea.onably b. .xpected to occur <br /> <br />prior to the completion of CAP. <br /> <br />Inflow. ot this lIIagnlt"e <br /> <br />would fill the reservoir. and could require r.l..... from <br /> <br />pact fifeeen (15) to twenty (20) year.. <br /> <br />based on the new condition.. <br /> <br />We have IllOv.4 fo~u4 v1 th <br /> <br />. <br /> <br />that. .ffort. .ven thouqh wat.r years <br /> <br />1976 and 1977 were <br /> <br />periods of SAv.re drougbt during which there was some <br /> <br />--' <br /> <br />respite in the tillinq of the res.rvoir.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.