My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06888
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:49 PM
Creation date
10/12/2006 1:56:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1982
Author
USDA
Title
Colorado River Water Quality Improvement Program - Final Environmental Impact Statement for Lower Gunnison Basin Unit - Montrose and Delta Counties CO and Uintah Basin Unit
Water Supply Pro - Doc Type
EIS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />- - <br />Table Al-t <br /> <br />- - <br />(Cont'd) <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />National Economic Development Account 11 <br />Lo....er Gunnison Salinity Control Study, Colorado <br />(Includes Cost of Onfarm Program Only) <br />($1,000,000 increments) <br /> <br />A. Bener telal Effects <br /> <br />I. Value of Goods and Servlce~ <br />a. oorartn Benpfits ($) <br />b. Do....n~tream Benefits ($) <br />c. 8("nefits during 11\5tal- ($) <br />latLon period <br /> <br />Total Beneficial Effects (5) <br /> <br />B. Adverse ~:ffect8 <br /> <br />~ <br />" <br />, <br />, <br />-, <br /> <br />I. Implementation Costs <br />a. project Installation ($) <br />b. Project Administration ($) <br />c. Operation [" Maintenance ($) <br />d. CO!:lts during tnstalla- ($) <br />p" riad 2/ <br /> <br />Subtotal Implementation Costs ($) <br /> <br />2. MltlKatlon Costs ($) <br />a. Full value repLlcpment. <br />I':nhance avoided an:~ali <br />(valley-wide) plus add new <br />acres if needed. <br /> <br />C. Net Beneficial i':ffects With- <br />out MltLgation <br /> <br />($) <br /> <br />D. Net Beneficial Effects With <br />MitlK,lt lon <br /> <br />($) <br /> <br />Plan i <br /> <br />o <br />0.52 <br />0,25 <br /> <br />0.77 <br /> <br />0.21 <br />0,02 <br />0.02 <br />0,11 <br /> <br />0.36 <br /> <br />0.41 <br /> <br />0,41 <br /> <br />plan 2 <br /> <br />0.17 <br />I,B5 <br />0.9B <br /> <br />3,00 <br /> <br />0.57 <br />0.06 <br />0.02 <br />0,27 <br /> <br />0.92 <br /> <br />o <br /> <br />0.1.3 <br /> <br />plan 3 <br /> <br />o <br />4,90 <br />2.39 <br /> <br />7.29 <br /> <br />2.1.2 <br />0.24 <br />0.02 <br />1. 16 <br /> <br />4.04 <br /> <br />0,76 <br /> <br />3.25 <br /> <br />2.49 <br /> <br />plan 4 <br /> <br />-0.19 <br />7.75 <br />3,69 <br /> <br />11.25 <br /> <br />4.18 <br />0.42 <br />0.3B <br />2.05 <br /> <br />7.03 <br /> <br />0.23 <br /> <br />4.22 <br /> <br />3.99 <br /> <br />plan 5 <br /> <br />2.00 <br />9.95 <br />5.B4 <br /> <br />17.79 <br /> <br />5.53 <br />0,56 <br />0, J7 <br />2.65 <br /> <br />9,11 <br /> <br />I.B2 <br /> <br />6.66 <br /> <br />6.65 <br /> <br />plan 6 <br /> <br />4.06 <br />15,41 <br />9.52 <br /> <br />26,99 <br /> <br />9,99 <br />1.01 <br />0.73 <br />It.B] <br /> <br />16,56 <br /> <br />3.42 <br /> <br />12.43 <br /> <br />9.01 <br /> <br />t:€TE <br /> <br />plan 7 <br /> <br />3.76 <br />15,)5 <br />9,45 <br /> <br />26,7B <br /> <br />11. 26 <br />1.14 <br />.75 <br />5.40 <br /> <br />16,55 <br /> <br />2.20 <br /> <br />10,23 <br /> <br />6.03 <br /> <br />plan 8 <br /> <br />B.6B <br />19.29 <br />13.67 <br /> <br />41.64 <br /> <br />2]./.6 <br />2.37 <br />1.68 <br />11.32 <br /> <br />36,63 <br /> <br />5.00 <br /> <br />2,61 <br /> <br />-2.69 <br /> <br />II <br /> <br />Costs ....'!re ;ullortlzed ..t 7 3/8% for 25 years. July 1980 price base. Iknefits ilnd costs W\!H' computed In <br />prcs('nt valli'! terms usln~ IQ-year installation period. <br />includes Interest on O&M and construction costs and O&M costs during instalL-Hlon perIod. <br /> <br />2/ <br /> <br />2.06 <br /> <br />1.66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.