Laserfiche WebLink
<br /> <br /> <br />Plan Seven - Improved Irrigation Water Management and Onfarm Ditch Lining - <br />Mixed Levels - 169,000 Acres <br /> <br />By combining improved irrigation water management at the minimum <br />level of implementation with improved irrigation water management and onfarm <br />ditch lining at the maximum level this is one plan that maximizes salt load <br />reduction having economic feasibility. This plan includes 109 miles of off-farm <br />lateral improvements needed to assure proper operation of the improved onfarm <br />sytems. However, not all watersheds included in this plan have individual <br />economic feasibility, but all watersheds in the *alley are included because a <br />greater salt load reduction would be achieved. Watersheds at the respective <br />level of implementation are tabulated below, except that lining the small <br />off-farm laterals in Watersheds 2 and 24, and the large off-farm laterals in <br />Watersheds 5, 7, and 25 is not economically feasible. <br /> <br />Level of <br />Implementation <br /> <br />Scope of <br />Improvement <br /> <br />Watersheds Areas <br />Included in Plan 7 <br /> <br />Improvement <br />Area II <br /> <br />2, 5, 6, 10, 12, <br />13, 14, 15, 16, 18, <br />23, 24, 25 & 26 <br /> <br />Irrigation Water Management Minimum <br /> <br />89,400 acres <br /> <br />Irrigation Water Management <br />& Onfarm Ditch Lining Minimum <br /> <br />4, 21 <br /> <br />7,900 acres <br /> <br />Irrigation Water Management <br />& Onfarm Ditch Lining Maximum <br /> <br />I, 3, 7, 8, 9, 11, <br />17, 19, 20 & 22 <br /> <br />71,700 acres <br /> <br />!I Proportionally adjusted to exclude 2,000 acres converted to urban use. <br /> <br />. . <br /> <br />The onfarm portion of this plan can be implemented at a one-time construction <br />cost of $115,924,000. Technical assistance and administrative costs, estimated <br />to be $23,740,000, make a total installation cost of $139,664,000. Including <br />the 54 miles of off-farm laterals in watersheds 1, 3, and 9 with this plan <br />will add $10,136,000 to the construction cost and $2,000,000 to the cost of <br />technical assistance and administration making a total installation cost of <br />$151,800,000. <br /> <br />The 300,000 ton reduction in salt loading represents an 68 percent reduction <br />in total salt load being delivered to the Colorado River. Adding the off-farm <br />laterals to this plan will increase the potential salt load reduction by 35,~00 <br />tons making a total of 335,000 tons. . <br /> <br />Implementation of this plan could impact an estimated 3,800 acres, or about 10 <br />percent, of wetlands in the Lower Gunnison Unit. ' Full mitigation for the <br />impacted habitat, estimated to cost $17,600,000 wopld require upgrading the <br />habitat value on 8,900 acres of wetlands elsewhere in the valley undisturbed <br />by implementing this plan. There are 33,600 acres of wetlands avoided in this <br />alternative. <br /> <br />IV-16 <br /> <br />