Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />w <br />.... <br />o <br />CO <br /> <br />reducing, or eliminating th~ pollution of navigable waters and ground waters <br />(Section 1023)." <br /> <br />I <br /> <br />The seven states of the Colorado River Basin acting through the Colorado River <br />Basin SalInity Control Forum developed and agreed upon basinwide ~ater quality <br />standards for salinity, including numeric criteria and a plan of implementation <br />for salinity conlrol in 1975 (1975 Forum report). Each of the BaSin-adopted <br />....aler quality standards .,,;pre SUbsequently approved by EPA. The 1975 report <br />described the rationale for the selection of the criteria stations, <br /> <br />I <br /> <br />In response to Section 303(c) of the Clean ~aler Act, the Forum in 1978 reviewed <br />the standards. The Forum determined that these 1975 criteria Ioere appropriate. <br />The Forum also revie~ed and modified the plan of implementation in 1978. <br />Appropriate documents were adopted by the states. <br /> <br />Again, io 1981, the Forum in response to Section 303(c) revie~ed the criteria <br />and determined that the 1975 criterta are still appropriate. The numeric <br />criterIa are: <br /> <br />Bela.... Hoover Dam <br />Belo~ Parker Dam <br />Imperial Dam <br /> <br />723 mgfL <br />747 mgfL <br />879 mgfL <br /> <br />As In 1978, the plan of implementation <br />changes that have occurred since 1978. <br /> <br />~as revie~ed and modified <br />The principal components <br /> <br />to reflect <br />of the plan <br /> <br />are: <br /> <br />1. <br /> <br />Prompt construct ton by the Department of the Interior of two salinity <br />control units authorized by Section 202, Title II of Publlc Law 93-320, <br />namf'ly the Paradox \'alley and Grand Valley Units. <br /> <br />> <br />.. <br /> <br />Expeditious duthorization and construction by the Department of the Interior <br />of the ~eeker Dome unit and 10 of the units listf'd in Section 20)(a)(1), <br />Title II of P.L. 93-320, or their equivalents after receipt of favorable <br />planning reports, <br /> <br />3. Expeditious implementation by the Department of Agriculture of ontarm and <br />related improvement measures for salinity control. <br /> <br />4. Implementation ot salinity Control measures by the Bureau of Land ~anagement <br />to reduce salt contribution from public domain lands. <br /> <br />5. The placing of effluent limitations, principally under the Sational Pollutant <br />Discharge Elimlnation System (SPDES) permit program, provided for In <br />Section 402 of the Clean water Act of 1977 on industrial and municipal <br />discharges based on the Forum's 1977 policy on salinity control through <br />the SPDES permits. <br /> <br />6. Implementation of the 1980 forum policy for the use of bra~kish and/or <br />saline ~aters for industrial purposes. <br /> <br />7. Inclusion of the 208 ~ater Quality ~anagement Plans. Individually, the <br />Basin states have developed ~3ter quality management plans to conform to <br />the requirements of Section 208 of the Clean ~ater Act, The ~ater quality <br />management plannin~ process is continuing, As the plans are refined or <br />ne~ elements added and after such changes have been adopted by the states <br />and approved by EPA, those portions of the plans dealing ~ith salinity <br />control ~ill become part of the implementation plan. <br /> <br />111-2 <br />