My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06876
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06876
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:45 PM
Creation date
10/12/2006 1:55:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.350
Description
Lower Gunnison Basin Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
5/1/1981
Title
Draft Report of the Lower Gunnison Salinity Control Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE II-2. MANAGEMENT AND STRUCTURAL PRACTICES CONSIDERED <br />FOR THREE LEVELS OF IMPROVEMENT <br />LOWER GUNNISON SALINITY CONTROL STUDY, COLORADO <br /> <br />Leve 1 ;~ <br />Improvement Mana~ement Practices <br /> <br />1 <br />(Minimum) <br /> <br />2 <br />(Total) <br /> <br />Time of Set-Closest multiple <br />of 3 hours <br />Number of Irri~ations <br />Flow Rate per furrow unchan~e <br />from present practice 1/ <br /> <br />Time of Set-Closest multiple <br />of 12 hours 2/ <br />Number of Irri~ations <br /> <br />Flow Rate per Furrow i/ - <br />~easured to closest I ~allon <br />per minute <br /> <br />3 <br />(Total With <br />Automation) <br /> <br />Time of Set-multiple of 3 hrs. <br />Number of Irrigations <br />Flow Rate per Furrow 2/ - <br />measured to closest l-~allon <br />per minute <br /> <br />Chan~e Irri~ation Method to <br />Drip, Sprinkler or Border <br /> <br />IRRIGATED LAND <br />Structural Practices <br /> <br />Land Leveling <br />Water Measuring Devices <br />Ditch Lining or Pipelines <br /> <br />Land Leveling <br />Water Measuring Devices <br />Ditch Lining or Pipelines <br /> <br />Land Leveling, Including <br />Combining of Fields <br />Ditch Lining, Including some <br />Tailwater Ditches <br />Pipelines and Gated Pipe <br />Closed Drains <br /> <br />Automated Timing Devices and <br />Controls <br />Land Leveling <br />Water Measuring Devices <br />Ditch Linin~ or Pipelines <br />Land Leveling, Including <br />Combining of Fields <br />Ditch Lining, Including some <br />Tailwater Ditches <br />Pipelines and Gated Pipe <br />Closed Drains <br /> <br />Land Leveling, Including <br />Combining of Fields, Except <br />where Drip or Sprinkler <br />Irrigation will be used <br />Combine Fields and Reorganize <br />Irrigation System <br /> <br />1/ Values representative of present practice were-determined by onfann <br />inventory. <br />2/ Duration of irrigation in multiples of 12-hours is typical of present <br />practice. <br />3/ To avoid erosive velocity of flow an internal constraint of the program <br />limited maximum flow rate to the value of 15 divided by the field s.lo~ <br />percent (I5/S). <br /> <br />II-8 <br /> <br />, <br /> <br />;1 <br />,uGlill. <br />\' <br />
The URL can be used to link to this page
Your browser does not support the video tag.