Laserfiche WebLink
<br />26 <br /> <br />3972 <br /> <br />RUEDI D~I AND RESERVOIR, COLO. <br /> <br />consultation with tho Colorado Game and Fish Commission. The- <br />powers of sueh eommission shall be- limited to the collectiOl! of data,. <br />the making of findings of fact, and the snggestH.lll of ehanges m operat- <br />ing' principles. . <br />These operating principles shall be and do conEtltute a. contract <br />between the sianatorv partIes, and sh,1l1 lllure to the benefit of and <br />sha']l be and l~nrLin hillding upon sa.id parties, their respective suc- <br />ce~sors Hnd assigns. <br />Execnted at. Denver, Colo., this:lOt.h day of April Hl5D. <br />COLORADO 'VATER CO~SER\'.\TIO~ <br />BOARD. <br />Bv STEVE MeN ICHOLS, <br />Ch"a.ii'man.,' Oove'f'1tol',8tate of Colorado. <br /> <br />Attest. : <br /> <br />Attest: <br /> <br />FELIX L. Sp..\nK~. <br />Director awl Secretary. <br />SOUfHEASTFjRN COl.oRAno 'VATER <br />CONSEHVANCY DIS'}'HICT, <br />By IT. SELBY Y DUNG, Pre8ident. <br /> <br />Attest, <br /> <br />.J. E. SHOEN, Secl'eta.-ry. <br />COLORADO RI\'ER 'YATER COKSER- <br />VATWN DISTRICT. <br />By Cy T. r.rANSE", President. <br /> <br />Attest: <br /> <br />PHILIP P. S),[ITH,8ce-'rctar!J. <br />SOUTHWESTER~ "rATER CONSER- <br />VATION DISTRICT, <br />By IllA E. KELLY, P,'esident. <br /> <br />AnCIIIE ll. TONEn, Secretary. <br /> <br />PLc\N OF DEYEUWMENT <br /> <br />D'...'8C,.;ptlon <br />The Ruedi Dam and Resel"Toir will be Jocated on the FryiDg]>an' <br />River, a tributary of the. Roaring Fork Ri,'er which enlBrs the Colo- <br />rado HiveI' at. Glenwood Springs, Colo. The dmnsite is ribout 14 miles' <br />east of Basalt, Colo., and about. a. quarteT of n mile below the confluence <br />of Ruedi Creek with the Fryingpall Ri\"er. The. reselToir will he <br />about 41j2 miles long' with a maXUllum width of about three-quarters <br />of a mile. Location of the dam :lnd reservoir is shown 011 bot,h exhibits <br />1 and 2. <br />.. The dam will be an Cllrthfill strueture with crest. eJe\"at.ion of 7.780, <br />feet mean sea level. Crest length will be 1,050 feet. and heights above <br />streambed and foundlltion will be 270 feet a,nd 290 feet, respectively. <br />A glory-hole type spillway with capacity of 9,250 eubic feet per second <br />will be provided, together with a'tunnel outlet. through t.he right abut.- <br />ment of the dum. The reservoir ontlet will be by tunnel through t.he <br />left, abutment and will' h,ne a ('aplleit)' of 1,000 c.f.s. 'Yilh nOl'Inal <br />storage c,lpa..city of 100,000 HC'.re-feet., t.lle wate.r slIrface- will cover an <br />ftl"e:1 of about. 1,000 acres nt elevation 7.7(14 feet m.s.1. Engineerin;..r <br />details are shown on the preliminar}' estimate dr;lwillg~ i:xhibit. 3. <br />