My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06826
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:31 PM
Creation date
10/12/2006 1:53:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.600.20
Description
Pleasant Valley Pipeline
State
CO
Basin
South Platte
Date
11/1/2000
Author
USDOI/BOR
Title
Pleasant Valley Pipeline Draft Environmental Assessment
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />'. <br />II, <br />I <br />I <br />.1 <br />J <br /> <br /> <br />United States Department of the Interior <br /> <br />IN REPLY <br />REFER TO. <br /> <br />BUREAU OF RECLAMA nON <br />Eastern Colorado Area Office <br />l1056WestCountyRD 18E <br />Loveland, Colorado 80537-9711 <br /> <br />. tllO~~'''EM' O. '>If ""f. " <br />"~~~ ....'O~" <br />) <br />-'",- ...,.,~;:-_:- ""':-.,:.. - // <br />~. <br /> <br />EC-1340 (V Grizzle) <br /> <br />To: <br /> <br />Distribution List <br /> <br />Subject: <br /> <br />Draft Environmental Assessment - Pleasant Valley Pipeline Project- <br />Northern Colorado Water Conservancy District (District) - Colorado-Big <br />Thompson (C-BT) Project, Colorado <br /> <br />Dear Interested Parties: <br /> <br />Enclosed is a draft Environmental Assessment (EA) for the proposed Pleasant Valley <br />Pipeline project. The draft EA was prepared in accordance with the National <br />Environmental Policy Act to analyze potential environmental impacts associated with the <br />proposed water conveyance pipeline. The draft EA was prepared in cooperation with <br />Federal, state, and local agencies, and will lead to a Finding of No Signilicant Impact <br />(FONS!), if environmental impacts are found to be insignificant, or to an environmental <br />impact statement if environmental impacts are determined to be significant. <br /> <br />Please forward your comments to the above address or fax them to (970) 663-3212. <br />attention EC-1340 (Vie Grizzle). Comments should be received within 30days of the date <br />of this letter to be considered and incorporated into the final EA. Should you have any <br />questions regarding the draft EA, please contact Vie Grizzle at (970) 962-4366. <br /> <br />Sincerely, <br /> <br /> <br />Ji./k <br /> <br />Brian Person <br />Area Manager <br /> <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.